Allen Engineering Corporation (AEC) recently delivered a Model 6048 Bridge Deck Finisher to PCR Contractors to be used on the 11km-long Rt. Hon. Herb Gray Parkway project in Canada. The US$1.4 billion highway infrastructure project is under construction in the Ontario municipalities of Windsor, LaSalle and Tecumseh. The Rt. Hon. Herb Gray Parkway will carry car and truck traffic from Hwy 401 in Canada to a new crossing across the Detroit River to I-75 in Michigan. The works will improve traffic flow at Cana
June 24, 2013 Read time: 2 mins
156 Allen Engineering Corporation (AEC) recently delivered a Model 6048 Bridge Deck Finisher to PCR Contractors to be used on the 11km-long Rt. Hon. Herb Gray Parkway project in Canada.

The US$1.4 billion highway infrastructure project is under construction in the Ontario municipalities of Windsor, LaSalle and Tecumseh. The Rt. Hon. Herb Gray Parkway will carry car and truck traffic from Hwy 401 in Canada to a new crossing across the Detroit River to I-75 in Michigan. The works will improve traffic flow at Canada’s premier trade gateway. The scale of the project’s community enhancement and environmental features are also said to be unprecedented for a highway in Ontario. The Rt. Hon. Herb Gray Parkway consists of 11 tunnels of which seven will be constructed by PCR Contractors. Because of the length and width of the tunnels, the covers were designed to be poured in transverse strips, some as wide as 48m, with each pour consuming 800 to 1,000m³ of concrete subsequently placed in three pump trucks. For covers for each of the seven tunnels the firm is constructing, PCR Contractors is required to make 33 individual pours using an Allen Bridge Deck Finisher

To accomplish these extreme pour widths, PCR Contractors is said to have relied on AEC to provide them with a 49.37m long Allen Model 6048 Bridge Deck Finisher. Allen designed this machine using their standard 1.21m deep truss system and added a transition truss system to increase the mainframe of the machine to 1.67m tall, allowing the machine to span the Model 6048’s 49.37m length.

In conjunction with finishing these extremely wide slabs, PCR also has to apply curing materials to the slabs. To accomplish this, Allen provided their Model 4834 Motorised Work Bridge with a rolling work platform attached to it. This is said to have allowed the contractor to cover the slabs with curing materials with minimal manpower.

For more information on companies in this article

Related Content

  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • Detroit-Windsor Tunnel crossing gets new customs facilities
    February 17, 2015
    The governments of Canada and the province of Ontario officially opened a new customs plaza at the Windsor-Detroit Tunnel, one of the busiest road crossings between the United States and Canada. The Canadian federal government provided US$8 and the province added $20 million for the project that is part of security improvements and to speed up people processing facilities on the Canadian side of the tunnel. Among the upgrades are new vehicle access lanes, new buildings for the Canada Border Services Agency
  • Canada, US officials soon to settle planned Detroit bridge issue
    February 5, 2015
    An end to a thorny issue is close at hand concerning who will fund construction of a border customs plaza on the US side of a planned bridge linking Canada and the United States. US President Barack Obama’s US$4-trillion budget did not set aside any money for the plaza for a second consecutive year, further irritating Canadian officials who are overseeing construction of the bridge. It appears that the Canadian government might end up footing the entire bill, according to a report in Toronto’s Globe a
  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c