Skip to main content

Acrow supplies temporary bridge during Turcot Interchange project

Acrow Bridge has supplied a long-term temporary modular bridge to main contractor KPH Turcot for its work on the Turcot Interchange reconstruction in Montréal, Canada. The 32.3m-long Turcot modular steel bridge - Acrow’s longest clear span bridge in Canada – is 5m wide and has an orthotropic deck. The rented Acrow components arrived on site late last year and the bridge was opened to traffic in December. It is expected to be in place for two years. The Turcot Interchange is a three-level stack freeway int
June 28, 2018 Read time: 2 mins
Terex Bid-Well 3600 paver: LED lighting delivers additional visibility at night
Acrow Bridge has supplied a long-term temporary modular bridge to main contractor KPH Turcot for its work on the Turcot Interchange reconstruction in Montréal, Canada.

The 32.3m-long Turcot modular steel bridge - Acrow’s longest clear span bridge in Canada – is 5m wide and has an orthotropic deck. The rented Acrow components arrived on site late last year and the bridge was opened to traffic in December. It is expected to be in place for two years.

The Turcot Interchange is a three-level stack freeway interchange and the largest in the province of Québec. It is heavily travelled and carries an estimated 300,000 vehicles per day.

Because it is located in a high density residential and commercial area and links the Montréal-Pierre Elliott Trudeau International Airport with downtown Montréal, it is critical that traffic flow be maintained throughout the project.

Due to site restrictions, it was impossible to install the bridge using a crane. Instead, a full cantilever was designed using a 48.7m launching nose. The installer used pre-manufactured 3m sections and launched in sequence.

Acrow’s structure will allow vehicles to travel from northbound Autoroute 15 to westbound Autoroute 20 and keep workers safe, said Benoit Forget, Acrow’s regional director for Québec and New Brunswick provinces.

KPH Turcot - a partnership of Construction Kiewit and Parsons Canada, WSP Canada and Holcim Canada – won the design-build contract for the Turcot Interchange.

The overall US$2.9 billion Turcot programme is the largest in the Quebec province’s ministry of transport history. KPH Turcot’s design-build contract is the largest value portion of the programme.

When completed, the carbon-neutral project will provide 6.7km of multiuse trails, reduced maintenance costs as well as improved links between neighbourhoods. Also included will be more than 30hectares of green space and lower noise levels for nearby residents.

Also as part of the project, 145-lane-kilometres of roadways will be designed and constructed while Canadian National Railway mainline tracks will be relocated. Completion is set for 2020.

Related Content

  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Gordie Howe Bridge towers rise
    January 19, 2022
    Each tower is composed of 51 segments constructed using a jump-form climbing system.