Skip to main content

Acrow supplies temporary bridge during Turcot Interchange project

Acrow Bridge has supplied a long-term temporary modular bridge to main contractor KPH Turcot for its work on the Turcot Interchange reconstruction in Montréal, Canada. The 32.3m-long Turcot modular steel bridge - Acrow’s longest clear span bridge in Canada – is 5m wide and has an orthotropic deck. The rented Acrow components arrived on site late last year and the bridge was opened to traffic in December. It is expected to be in place for two years. The Turcot Interchange is a three-level stack freeway int
June 28, 2018 Read time: 2 mins
Terex Bid-Well 3600 paver: LED lighting delivers additional visibility at night
Acrow Bridge has supplied a long-term temporary modular bridge to main contractor KPH Turcot for its work on the Turcot Interchange reconstruction in Montréal, Canada.

The 32.3m-long Turcot modular steel bridge - Acrow’s longest clear span bridge in Canada – is 5m wide and has an orthotropic deck. The rented Acrow components arrived on site late last year and the bridge was opened to traffic in December. It is expected to be in place for two years.

The Turcot Interchange is a three-level stack freeway interchange and the largest in the province of Québec. It is heavily travelled and carries an estimated 300,000 vehicles per day.

Because it is located in a high density residential and commercial area and links the Montréal-Pierre Elliott Trudeau International Airport with downtown Montréal, it is critical that traffic flow be maintained throughout the project.

Due to site restrictions, it was impossible to install the bridge using a crane. Instead, a full cantilever was designed using a 48.7m launching nose. The installer used pre-manufactured 3m sections and launched in sequence.

Acrow’s structure will allow vehicles to travel from northbound Autoroute 15 to westbound Autoroute 20 and keep workers safe, said Benoit Forget, Acrow’s regional director for Québec and New Brunswick provinces.

KPH Turcot - a partnership of Construction Kiewit and Parsons Canada, WSP Canada and Holcim Canada – won the design-build contract for the Turcot Interchange.

The overall US$2.9 billion Turcot programme is the largest in the Quebec province’s ministry of transport history. KPH Turcot’s design-build contract is the largest value portion of the programme.

When completed, the carbon-neutral project will provide 6.7km of multiuse trails, reduced maintenance costs as well as improved links between neighbourhoods. Also included will be more than 30hectares of green space and lower noise levels for nearby residents.

Also as part of the project, 145-lane-kilometres of roadways will be designed and constructed while Canadian National Railway mainline tracks will be relocated. Completion is set for 2020.

Related Content

  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove
  • New US$534 million tollway for Illinois
    December 2, 2024
    A new US$534 million tollway for Illinois will link to O’Hare International Airport.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.