Skip to main content

Acrow restores Nebraska routes after flooding

Acrow Bridge recently used its steel modular bridges to help restore roads on critical routes in the US state of Nebraska after major regional flooding.
February 11, 2020 Read time: 1 min
Acrow provides safe and reliable detours in the state of Nebraska after major floods

The first Acrow structure, on Highway 281 in the Spencer Dam/Niobrara River consists of six spans of 30.5m each with an 5.5m roadway width. The second detour bridge is on Highway 12 west of the Village of Niobrara and also consists of six 30.5m spans, but has a 7.3m width.

Components for the projects began shipping in early July with the anticipation that both structures would be completed by early August. The Spencer Dam Highway 281 bridge reopened on July 29 and the Niobrara Highway 12 bridge on August 13. It is anticipated the bridges will be in use for 12 to 16 months until the permanent structures are completed, said Tom Pinder, Acrow’s western sales manager.

Acrow, whose bridges are for sale or rent, has been in operation for over 60 years and operates in more than 80 countries, covering Africa, Asia, the Americas, Europe and the Middle East.

Related Content

  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • Grimsby’s Corporation Bridge work extended
    March 6, 2024
    Refurbishment of the nearly 100-year-old bascule bridge in northern England is being done by Spencer Group with project management by Equans.
  • Acrow Bridge seals deal for 144 modular bridges in Zambia
    August 11, 2015
    Acrow Bridge, an international bridge engineering and supply company, announced that it will start by the end of the year on a 144-bridge infrastructure project in Zambia. The work will be carried out exclusively by Zambian engineers, technicians and contractors who will be trained in the field by Acrow technicians on the assembly and installation of the bridges. Acrow said it is working with the Road Development Agency of the Republic of Zambia.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo