Skip to main content

Acrow restores Nebraska routes after flooding

Acrow Bridge recently used its steel modular bridges to help restore roads on critical routes in the US state of Nebraska after major regional flooding.
February 11, 2020 Read time: 1 min
Acrow provides safe and reliable detours in the state of Nebraska after major floods

The first Acrow structure, on Highway 281 in the Spencer Dam/Niobrara River consists of six spans of 30.5m each with an 5.5m roadway width. The second detour bridge is on Highway 12 west of the Village of Niobrara and also consists of six 30.5m spans, but has a 7.3m width.

Components for the projects began shipping in early July with the anticipation that both structures would be completed by early August. The Spencer Dam Highway 281 bridge reopened on July 29 and the Niobrara Highway 12 bridge on August 13. It is anticipated the bridges will be in use for 12 to 16 months until the permanent structures are completed, said Tom Pinder, Acrow’s western sales manager.

Acrow, whose bridges are for sale or rent, has been in operation for over 60 years and operates in more than 80 countries, covering Africa, Asia, the Americas, Europe and the Middle East.

Related Content

  • Bulgaria breaks ground for Martisa River bridge
    August 23, 2023
    The contract was awarded to local engineering firm GBS-Infrastructure Construction in Plovdiv, a subsidiary of the Bulgarian civil engineering group Glavbolgarstroy.
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Engine maker Deutz dumps full-year 2015 forecast amid poor trading
    September 16, 2015
    German engine maker Deutz Group said it will not meet its forecast for the current financial year. A sluggish second quarter with “very low” new orders means revenue is expected to fall by around 20% compared with the forecasted 10% drop, according to a corporate statement. “Consequently, the second half of 2015 will be significantly worse than the first half of the year,” the statement said. “Given the low level of business, Deutz will only be just about break even in terms of EBIT this year. Unt
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.