Skip to main content

Acrow lends critical support for the Cradock Bridge renovation

International bridge engineering and supply company Acrow recently installed a modular steel structure to maintain traffic flow during renovation of the historic Cradock Bridge in the US The bridge spanning the Mystic River in Medford, a suburb of Boston, Massachusetts, was built in 1637, then rebuilt in 1880 and again rehabilitated in 1934. It was determined to be structurally deficient several years ago - one of many of state-owned bridges - and was put into the state’s Accelerated Bridge Program. W
October 28, 2016 Read time: 2 mins
Acrow bridge solution for the Cradock Bridge renovation
International bridge engineering and supply company Acrow recently installed a modular steel structure to maintain traffic flow during renovation of the historic Cradock Bridge in the US

The bridge spanning the Mystic River in Medford, a suburb of Boston, Massachusetts, was built in 1637, then rebuilt in 1880 and again rehabilitated in 1934. It was determined to be structurally deficient several years ago - one of many of state-owned bridges - and was put into the state’s Accelerated Bridge Program.

Work on the stone arch bridge is to include demolition and rehabilitation of three concrete piers underneath the structure and installation of renewed stone archways, upgraded utilities, new pavement and sidewalks.

Remnants of an abandoned dam structure will be renovated to restore full flow of the river. It is anticipated that the project will be completed in November 2019.

Acrow’s two-lane detour structure is 41m at centre-line with a width of almost 9.2m.

Because two of the original bridge’s four lanes are closed during the rehabilitation, it was critical to add additional capacity to handle daily traffic in excess of 16,000 vehicles, including almost 300 public transit buses.

Acrow’s bridge solution was purchased by MassDOT for reuse after the completion of the Cradock Bridge job. Design engineer for the project is 1397 AECOM and the contractor is R. Zoppo, based in Stoughton in Massachusetts.

“The growing use of our components for planned repair and rehabilitation work proves the value of Acrow to deliver a safe product and keep state DOTs and contractors on time and on budget,” said Bill Killeen, chief executive of Acrow Bridge.

For more information on companies in this article

Related Content

  • US bridges need repair, ARTBA reports
    March 26, 2021
    ARTBA reports that 220,000 US bridges need repair.
  • Cape Fear NC bridge replacement
    June 13, 2024
    A plan to replace North Carolina’s Cape Fear Memorial Bridge.
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b