Skip to main content

Zimbabwe highway project faces delay

The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract. The hig
July 12, 2018 Read time: 2 mins
The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract.


The highway project involves dualling the route from Beitbridge that lies close to the border with South Africa all the way to Chirundu, at the border with Zambia to the north, with a total expected cost of some US$2.7 billion. The route runs through the capital Harare, with a bypass also planned around the city. The project is split broadly into two main sections, between Harare and Chirundu in the north of the country and Harare and Beitbridge in the south. Some $21 million of funding has been supplied by Japan to pay for work on the Makuti to Chirundu stretch of the north-south highway. This section measures just 6.5km long but features severe gradients at present.

There are also plans to dualise the route from Beitbridge and through Zimbabwe’s second city, Bulawayo, to Victoria Falls, an important route for tourism as well as trade. Victoria Falls also lies on Zimbabwe’s border with Zambia, but it close too with the borders of Botswana and Namibia, so the road connection provides an important trade and transport link for Southern Africa.

Questions are now being asked within Zimbabwe as to why the contract was awarded to Geiger International in the first place. Although Geiger International claims to have experience in the construction sector, particularly in China, its expertise seems mainly to lie in supplying goods as well as in manufacturing and supplying fencing.

Related Content

  • Norway’s new ‘green’ highway route
    November 13, 2020
    A new route in Norway will provide a faster and greener highway connection between the capital city Oslo and the northern city of Trondheim
  • $500 million for Tblisi bypass project
    June 20, 2025
    A $500 million funding package will help build the Tblisi bypass in Georgia.
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • Funding for Rwanda roads rebuild
    July 18, 2016
    Foreign funding will help pay for key road rebuilding work in Rwanda. Loans worth US$162.4 million are being provided by the African Development Bank (AfDB) and the Japan International Cooperation Agency (JICA), with a $22 million development grant also coming from the EU. These financial sources will help pay for work to improve the 92km long link connecting Kayonza with Rusumo as well as the 116km road between Kagitumba and Kayonza. These road links are of importance as they help connect Rwanda to its nei