Skip to main content

Zimbabwe highway project faces delay

The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract. The hig
July 12, 2018 Read time: 2 mins
The project to build Zimbabwe’s crucial north-south highway link is facing delays, with the contract now having to be re-awarded. The tender was originally awarded to an Austrian firm, Geiger International, but with progress having proven very slow this has been withdrawn. The deal has not yet been re-awarded. But the Zimbabwe Government is at present in discussions with the second bidder from the original tender process, Anhui Foreign Economic Construction Group Limited (AFECC), over the contract.


The highway project involves dualling the route from Beitbridge that lies close to the border with South Africa all the way to Chirundu, at the border with Zambia to the north, with a total expected cost of some US$2.7 billion. The route runs through the capital Harare, with a bypass also planned around the city. The project is split broadly into two main sections, between Harare and Chirundu in the north of the country and Harare and Beitbridge in the south. Some $21 million of funding has been supplied by Japan to pay for work on the Makuti to Chirundu stretch of the north-south highway. This section measures just 6.5km long but features severe gradients at present.

There are also plans to dualise the route from Beitbridge and through Zimbabwe’s second city, Bulawayo, to Victoria Falls, an important route for tourism as well as trade. Victoria Falls also lies on Zimbabwe’s border with Zambia, but it close too with the borders of Botswana and Namibia, so the road connection provides an important trade and transport link for Southern Africa.

Questions are now being asked within Zimbabwe as to why the contract was awarded to Geiger International in the first place. Although Geiger International claims to have experience in the construction sector, particularly in China, its expertise seems mainly to lie in supplying goods as well as in manufacturing and supplying fencing.

Related Content

  • Chile highway link faces future issues
    January 24, 2017
    Chile’s busy Route 68 between capital Santiago and the country’s main port of Valparaiso faces an uncertain future. The 110km highway carries heavy traffic volumes and is close to its capacity of 4,500 vehicles/hour at peak periods, with extensive works required to improve the route. The work to upgrade Route 68 is expected to cost up to US$170 million, with eight sections of the highway in particular need of attention. The tender process for the upgrade work will open shortly. The Chilean Government opt
  • New Zambia road project to connect with DRC
    September 15, 2017
    A major upgrade is planned to the road connecting Zambia with the neighbouring Democratic Republic of Congo (DRC). The 321km road link will be upgraded to dual carriageway status between Zambia’s capital, Lusaka, and the city of Ndola, which lies close to the border with the DRC. The upgraded route will also run through Kabwe, while improving the connections to Zambia’s copper producing area situated around Ndola.
  • Road transport key to Africa's trade links
    February 17, 2012
    Road transport is the key to improving Africa's links within its own territory, and further afield as Patrick Smith reports. Development of road transportation is the key to the future of the African economy, and countries on the continent are making great strides. According to a report by a transport infrastructure expert at the New Partnership for Africa's Development (NEPAD), within the next 15 years the value of trade in Africa could reach US$250 billion if a $32 billion investment is made to integrate
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi