Skip to main content

Zambian bridge replacement programme

A bridge replacement programme in Zambia is connecting communities.
By MJ Woof March 9, 2020 Read time: 2 mins
Training has been carried out by Acrow Bridge in Zambia for local personnel on the modular bridge nits - image © courtesy of Acrow Bridge

Zambia is benefiting from a programme to install bridges and connect rural communities. The country has bought over 130 modular steel bridges measuring from 12m in length to more than 100m-long from Acrow Bridge.

The bridges include single- and multi-span span structures of one- and two-lane widths. And Acrow Bridge is providing training to Zambian engineers, technicians and contractors in assembly, installation and maintenance of the bridges, which were recently delivered to Zambia’s Road Development Agency.

These bridges are being installed where such links are particularly critical and will contribute to the integration of remote rural communities into the broader domestic and regional economy.

Through its financed Comprehensive Bridge Development Program model, Acrow has worked on a number of large infrastructure development projects in Africa, including the supply of more than 150 bridges to the Government of Angola, 100 bridges to the Department of Feeder Roads in Ghana, and 44 bridges to the Government of Cameroon.
 
Acrow’s prefabricated steel bridges feature a modular design that allows for the easy customisation of each structure to meet specific site requirements. They can be erected in days or weeks by a local workforce and minimal heavy equipment is required, while offering a service life of 75 years or more. Fabricated in the US from high-strength, high-quality steel, the components are hot-dip zinc galvanised to protect against corrosion.
 

Related Content

  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • UNCIEF promoting safer commutes for children to education
    June 4, 2015
    Children should have the right of a safe journey to and from school, as part of a wider strategy to build safe, healthy and liveable communities, recommends a new report from UNICEF and the FIA Foundation. The report, ‘Safe to Learn’, was published to mark the 3rd United Nations Global Road Safety Week, which has a theme of child safety. The report was launched at an event at the World Bank in Washington DC by Zoleka Mandela, a global road safety activist, bereaved mother of a road traffic victim, and gran
  • Climate resiliency: beyond design and construction
    July 18, 2023
    By Zeev Halber, CEO of AnyWay Solutions
  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.