Skip to main content

Zambian bridge replacement programme

A bridge replacement programme in Zambia is connecting communities.
By MJ Woof March 9, 2020 Read time: 2 mins
Training has been carried out by Acrow Bridge in Zambia for local personnel on the modular bridge nits - image © courtesy of Acrow Bridge

Zambia is benefiting from a programme to install bridges and connect rural communities. The country has bought over 130 modular steel bridges measuring from 12m in length to more than 100m-long from Acrow Bridge.

The bridges include single- and multi-span span structures of one- and two-lane widths. And Acrow Bridge is providing training to Zambian engineers, technicians and contractors in assembly, installation and maintenance of the bridges, which were recently delivered to Zambia’s Road Development Agency.

These bridges are being installed where such links are particularly critical and will contribute to the integration of remote rural communities into the broader domestic and regional economy.

Through its financed Comprehensive Bridge Development Program model, Acrow has worked on a number of large infrastructure development projects in Africa, including the supply of more than 150 bridges to the Government of Angola, 100 bridges to the Department of Feeder Roads in Ghana, and 44 bridges to the Government of Cameroon.
 
Acrow’s prefabricated steel bridges feature a modular design that allows for the easy customisation of each structure to meet specific site requirements. They can be erected in days or weeks by a local workforce and minimal heavy equipment is required, while offering a service life of 75 years or more. Fabricated in the US from high-strength, high-quality steel, the components are hot-dip zinc galvanised to protect against corrosion.
 

Related Content

  • State of the art tunnel a conservation triumph
    February 28, 2012
    The opening of a 1.8km tunnel in southern England is designed to ease traffic bottlenecks in an environmentally sensitive area. Patrick Smith reports
  • Engineering the Saadiyat Expressway
    February 24, 2012
    A new bridge, said to be the largest in the United Arab Emirates (UAE) in terms of area, is being constructed as part of a major highway project. The US$550 million Saadiyat Expressway project, which involves Leighton Construction (Abu Dhabi), related to one of Australia's largest contracting groups, in constructing a ten-lane, 6.5km long highway to link the UAE's main city, with an exclusive island lying just offshore.
  • First phase of Houston reversible HOV to HOT lanes completed
    April 19, 2012
    Houston’s Metropolitan Transit Authority of Harris County (Metro) working with prime contractor TransCore has commissioned the first of five reversible high occupancy toll (HOT) lane corridors. One of the most substantial undertakings of its kind to date in the United States, Metro’s conversion of high occupancy vehicle (HOV) lanes to HOT lanes will increase utilisation of the HOV system and subsequently relieve congestion in the general purpose freeway lanes. When completed, the programme will span 135k
  • £8 billion UK tunnel project to go ahead
    January 30, 2025
    The £8 billion UK Lower Thames Crossing tunnel project is to go ahead.