Skip to main content

Work underway for new road tunnel in Northern Poland

Preparation work is now starting on a new tunnel project to connect Uznam Island with Wolin Island in Northern Poland. Clearance work is underway at present with the actual construction activity due to start in January 2020. Costing €184 million, the work involves building a 3.4km unnel, which is due for completion by September 2022. The area is a key holiday destination for tourists and is close to the border with Germany. The new tunnel will improve transport connections and cut delays during holiday peri
October 25, 2019 Read time: 1 min

Preparation work is now starting on a new tunnel project to connect Uznam Island with Wolin Island in Northern Poland. Clearance work is underway at present with the actual construction activity due to start in January 2020. Costing €184 million, the work involves building a 3.4km unnel, which is due for completion by September 2022. The area is a key holiday destination for tourists and is close to the border with Germany. The new tunnel will improve transport connections and cut delays during holiday periods in particular when traffic volumes tend to be larger.

Related Content

  • Holiday traffic jams
    October 3, 2018
    In the Northern Hemisphere the summer means time for families to head off on holiday. At this time of year, many busy routes become jammed as holidaymakers head north, south, east or west, all in search of some rest and recreation. In the UK for example, the start of the school holiday period typically leads to families taking to the roads, with massive spikes in traffic volumes as a result. Some areas are particularly bad. The highway routes lying roughly between Munich in southern Germany and Milan in no
  • Discussions for Poland to Slovakia highway link
    January 23, 2018
    The Ministries of Transport for Poland and Slovakia have held discussions regarding the connection of the S1 and A1 highway links. The S1 road will run from the border with Slovakia to meet with the A1 highway at Pyrzowice in Poland. This road link should be ready for traffic in 2022. Also ready for traffic in 2022 should be Slovakia’s D3 highway.
  • New tunnel Acapulco Bay in Mexico
    May 25, 2016
    Acapulco is to benefit from a new tunnel route to cut congestion. A new road tunnel close to Acapulco Bay will help cut journey times for drivers in this part of Mexico. Both tourists and locals in Acapulco Bay currently experience long journey times at present, with a key problem being congestion on the 12km route from Juan N Alvarez International Airport to the Acapulco Bay beaches. During peak traffic times the journey along the scenic, winding road around the tip of the Cumbres de Llano Largo Mountain t
  • New Morocco tunnel in Casablanca
    April 10, 2017
    A new tunnel in the Moroccan city of Casablanca is being built in a bid to reduce congestion. The project will cost around US$81.65 million and includes building a 1.9km tunnel stretch as well as 2.3km of access roads. Preparation work commenced at the start of 2017, with tunnelling due to start shortly. The new Les Almohades tunnel will help cut Casablanca’s chronic congestion, a key issue during peak travel periods.