Skip to main content

Work underway on new Chinese highway project

Work is now underway in China to build a new highway from Wuhan-Ezhou. The project is expected to cost US$.129 billion and is due for completion in 2020. The new highway will measure 34.3km long and will feature up to three lanes in either direction, as well as 14 bridges. The work is being carried out by the contractor Wuhan Municipal Construction Group.
January 10, 2018 Read time: 1 min

Work is now underway in China to build a new highway from Wuhan-Ezhou. The project is expected to cost US$.129 billion and is due for completion in 2020. The new highway will measure 34.3km long and will feature up to three lanes in either direction, as well as 14 bridges. The work is being carried out by the contractor Wuhan Municipal Construction Group.

Related Content

  • Vietnam’s North-South Expressway sections
    March 24, 2025
    Key sections of Vietnam’s North-South Expressway are nearly complete.
  • Chinese highways to be improved
    February 20, 2023
    Important Chinese highways are to be improved.
  • Highway work boost in North Africa
    August 21, 2012
    North Africa is seeing construction business return - Mike Woof reports After a troubled period, stability looks to be returning to North African nations, which can only be good for the road construction sector. First Tunisia, then Egypt and finally Libya saw tumultuous revolts against the previous autocratic (and in one case at least, despotic) rulers. All three nations are now benefiting from a return to stability, with economic growth also improving once more.
  • New Laos highway connecting key cities
    January 10, 2018
    A new highway is being built in Laos, which will link the capital Vientiane with the city of Vangvieng. The route will stretch 113.5km and will form part of the Laos-China Highway Project. The work is costing US$1.3 billion and is being carried out by Yunnan Construction Engineering Group. The new highway will feature two lanes in either direction and will be constructed under a Build-Operate-Transfer (BOT) model. This new section will run from Naxaythong's Sikeuth and eastern Vangvieng, linking with the