Skip to main content

Work starting on Norway’s mega-tunnel project

Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the
January 5, 2018 Read time: 2 mins

Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the south west of Norway, to just 40 minutes. The project forms part of Norway’s transport plan to phase out ferry routes. A link from the tunnel will also connect with Kvitsøy.

The cost of the project has increased considerably since it was first proposed and provision has been made for further cost increases should these occur during construction. The route will be tolled for a period of 20 years when it opens to traffic. The construction phase is likely to face major challenges once work is underway and the project is likely to feature major gains in tunnel building while utilising the very latest advances in technology. Once the tunnel goes into use it is also likely to feature technology intended to reduce the risk of drivers becoming fatigued while using the link.

Related Content

  • Vietnam considering major new tunnel and highway projects
    March 9, 2018
    Vietnam’s Quang Ninh Province is setting out plans for major infrastructure projects. One project will be for a new tunnel link running under Cua Luc Bay, while the road projects are for the Ha Long-Cam Pha coastal route and the Van Don-Mong Cai Highway. Construction of the 1.3km undersea tunnel project in Ha Long city is now subject to a feasibility study. Construction is expected to commence in 2019.
  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta
  • Poland's A1 motorway progressing well
    February 9, 2012
    The second major phase of a north-south motorway in Poland is well underway. It will reduce congestion and improve safety as Patrick Smith reports Before the whistle blows to herald the start of Euro 2012, Poland's main seaport Gdansk will boast new roads, a new airport and a new stadium. The historic city in the north of the country on the Baltic coast will be one of the venues for football's 14th European Championship, being co-hosted by Poland and Ukraine.
  • Malaysia tunnel project moving ahead?
    July 11, 2018
    Plans are being made for a new link to connect Malaysia’s Penang Island with the Malaysian mainland. The Consortium Zenith Construction (CZC) won the tender process for the US$1.56 billion Penang Roads and Tunnels project, an integrated infrastructure plan that includes the new undersea tunnel. There are suggestions that a bridge would be a feasible alternative, although the tunnel link looks most likely for the project. The feasibility study for the tunnel should be complete in September 2018. Should the