Skip to main content

Work starting on Norway’s mega-tunnel project

Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the
January 5, 2018 Read time: 2 mins

Construction is now commencing on Norway’s Rogfast tunnel mega-project on the E39 route between Bergen and Stavanger. The project will cost around €1.8 billion to construct according to some estimates. The new project will set several world records as it will be the longest and deepest undersea road tunnel ever constructed, measuring 27.3km and reaching a maximum 392m below the sea bed. Once the new tunnel opens to traffic in 2025 or 2026 it will reduce the travel time between Bergen and Stavanger, in the south west of Norway, to just 40 minutes. The project forms part of Norway’s transport plan to phase out ferry routes. A link from the tunnel will also connect with Kvitsøy.

The cost of the project has increased considerably since it was first proposed and provision has been made for further cost increases should these occur during construction. The route will be tolled for a period of 20 years when it opens to traffic. The construction phase is likely to face major challenges once work is underway and the project is likely to feature major gains in tunnel building while utilising the very latest advances in technology. Once the tunnel goes into use it is also likely to feature technology intended to reduce the risk of drivers becoming fatigued while using the link.

Related Content

  • Work for Melbourne’s major tunnel project restarts
    March 12, 2018
    Construction work is restarting on Melbourne’s West Gate tunnel project. Construction of the tolled tunnel link is costing US$5.2 billion (A$6.7 billion). The project is controversial and has met with considerable political opposition in Australia. Those against the link say that building a second river crossing is not necessary and that it will merely increase travel costs for drivers as it will be tolled. However those in favour of the link say that it is required due to the heavy traffic congestion. A
  • Chennai Ring Road Project stage 3
    May 7, 2025
    $3.2 billion Chennai Ring Road Project stage 3 underway.
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.