Skip to main content

Work starting on new bridge for Botswana

Work is due to start on a new bridge connecting Botswana with neighbouring Zambia. The Kazungula Bridge is expected to cost some US$259 million. The new link will replace the ferry service operating at present between Botswana and Zambia. This project is being handled jointly by the authorities in both Botswana and Zambia. The bridge construction is being financed by Japanese International Corporation Agency (JICA) and the African Development Bank (AfDB).
June 2, 2014 Read time: 1 min
Work is due to start on a new bridge connecting Botswana with neighbouring Zambia. The Kazungula Bridge is expected to cost some US$259 million. The new link will replace the ferry service operating at present between Botswana and Zambia. This project is being handled jointly by the authorities in both Botswana and Zambia. The bridge construction  is being financed by 2640 Japanese International Corporation Agency (JICA) and the 1586 African Development Bank (AfDB).

For more information on companies in this article

Related Content

  • New bridge to span Zambezi River and link Zambia and Botswana
    August 14, 2014
    Work is starting on a new bridge that will span the Zambezi River and link Zambia with Botswana. The bridge will be located at Kazungula and will carry both road and rail connections. The structure will be some 923m long and the project is expected to cost in the region of US$200 million, with work including the construction of access roads as well as the border posts on either side of the Zambezi River. This new link will replace the existing ferry connection, improving transportation between Zambia and Bo
  • A new bridge will link Zambia and Botswana
    July 18, 2012
    A new bridge will improve cross border connections between Zambia and Botswana. The Kazungula Bridge will be constructed by Zambia, which will also build a new border post. Construction work is expected to commence once discussions between Zambia and Botswana have been completed. The Japanese Government is also involved in the discussions, as it is jointly funding the project in partnership with the African Development Bank (AfDB). Construction of the bridge is expected to cost in the region of US$200 milli
  • New Zambezi River bridge to link Botswana and Zambia
    August 13, 2015
    Work is now underway on the new Zambezi River crossing, which will improve transport links between Botswana and Zambia. The new bridge crosses the river close to the Zambian town of Kazungula and is costing some US$259.3 million to construct. The bridge will be 923m long and will carry both rail and road traffic, with border posts located at either end. The project is being carried out by South Korean contractor Daewoo Engineering and Construction. Financing for the project is being provided by the African
  • Japanese loan for Botswana to Zambia bridge
    October 18, 2012
    A new bridge link will be constructed between Botswana and Zambia in Southern Africa. Some of the funding for the bridge is being provided in the form of a US$113 million loan from the Japanese Government. The Kazungula bridge project is expected to cost $260 million in all. Close to $78.5 million is coming from the African Development Bank and Zambia is providing $1.6 million while the Japanese International Cooperation Agency (JICA) will offer $42 millionn. The work will commence in 2014 and the bridge sh