Skip to main content

Work to start on Fehmarn Belt link to start in autumn

Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou
April 4, 2019 Read time: 2 mins
The 18km Fehmarn Belt Fixed Link to open in 2028 at a cost of €8.7 billion

Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government.

Danish company 4782 Femern, which is responsible for the construction of the link,  will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland.

An autumn start would mean the link is opened on schedule, said Ole Birk Olesen, Denmark’s minister for transport, building and housing. This would also help to improve the possibility of securing the allocated 1116 European Union support of just under €421 million for the project which has an overall cost of around the €8.7 billion.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. The project’s approval process had been bogged down over environmental issues, especially within the German state of Schleswig-Holstein in which the southern end of 18km immersed tunnel will surface.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with Fmern. The joint venture has also worked on other landmark infrastructure projects, including the Øresund Tunnel in Denmark, the City Tunnel in Malmö, Sweden, the Medway Tunnel in England, as well as underground rail systems in Amsterdam and Copenhagen.

COWI is carrying out the detailed design of the tunnel (north tunnel section, south tunnel section, and ramps & portals). Meanwhile, 3392 SWECO is handling the design for the dredging and reclamation work.
 
A second framework contract, for technical support services to Femern, is being carried out by ÅF-Hansen & Henneberg.

Project information is available on the project’s official website, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.femern.com false https://femern.com/en false false%>

For more information on companies in this article

Related Content

  • New Zealand: 10-year plan sets out road infrastructure spending
    December 19, 2014
    New Zealand will spend US$30 billion over the next decade on public transport, including road works not just in major urban areas but in the provinces. The announcement was made by Transport Minister Simon Bridges after the government approved the draft Government Policy Paper 2015. The approved document takes into consideration concerns by local government that their transport infrastructure needs would be ignored in favour of those for large urban areas, the New Zealand Herald newspaper reported.
  • John Deere to show entire Final Tier 4/Stage IV diesel engine line-up
    January 6, 2017
    John Deere Power Systems’ (JDPS) entire Final Tier 4/Stage IV diesel engine line-up can be seen with the company showing its familiar PowerTech displacements of 2.9, 4.5, 6.8, 9 and 13.5litres. United States Final Tier 4 and European Union Stage IV emissions regulations for mobile off-highway diesel engines 56kW and above will be implemented in stages starting in 2014 and 2015. These standards maintain the particulate matter (PM) levels established by Interim Tier 4/Stage III B regulations while requiring a
  • John Deere to show entire Final Tier 4/Stage IV diesel engine line-up
    April 9, 2013
    John Deere Power Systems’ (JDPS) entire Final Tier 4/Stage IV diesel engine line-up can be seen with the company showing its familiar PowerTech displacements of 2.9, 4.5, 6.8, 9 and 13.5litres. United States Final Tier 4 and European Union Stage IV emissions regulations for mobile off-highway diesel engines 56kW and above will be implemented in stages starting in 2014 and 2015. These standards maintain the particulate matter (PM) levels established by Interim Tier 4/Stage III B regulations while requiring a
  • Fiorella Industrie is vital component
    January 6, 2017
    Fiorella Industrie is a vibrant firm specialising in the manufacture of tie rods, tie rod ends, ball joints, axial ball joints and other steering and suspension components for tractors, agricultural machinery, off-highway and automotive vehicles.