Skip to main content

Work to start on Fehmarn Belt link to start in autumn

Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government. Danish company Femern, which is responsible for the construction of the link, will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland. An autumn start wou
April 4, 2019 Read time: 2 mins
The 18km Fehmarn Belt Fixed Link to open in 2028 at a cost of €8.7 billion

Construction of the Fehmarn Belt Fixed Link between Denmark and Germany should start this autumn for completion in 2028, according to the Danish government.

Danish company 4782 Femern, which is responsible for the construction of the link,  will begin negotiations with two contractor consortiums for the first of the project’s works which will start on the Danish side. A tunnel element fabrication yard and a works harbour must be built in Rødbyhavn, as well as a tunnel portal on Lolland.

An autumn start would mean the link is opened on schedule, said Ole Birk Olesen, Denmark’s minister for transport, building and housing. This would also help to improve the possibility of securing the allocated 1116 European Union support of just under €421 million for the project which has an overall cost of around the €8.7 billion.

The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. The tunnel will replace a ferry service from Rødby and Puttgarden. The project’s approval process had been bogged down over environmental issues, especially within the German state of Schleswig-Holstein in which the southern end of 18km immersed tunnel will surface.

A Rambøll-Arup-TEC consultancy joint venture is engaged in a client consultancy services contract with Fmern. The joint venture has also worked on other landmark infrastructure projects, including the Øresund Tunnel in Denmark, the City Tunnel in Malmö, Sweden, the Medway Tunnel in England, as well as underground rail systems in Amsterdam and Copenhagen.

COWI is carrying out the detailed design of the tunnel (north tunnel section, south tunnel section, and ramps & portals). Meanwhile, 3392 SWECO is handling the design for the dredging and reclamation work.
 
A second framework contract, for technical support services to Femern, is being carried out by ÅF-Hansen & Henneberg.

Project information is available on the project’s official website, %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.femern.com false https://femern.com/en false false%>

For more information on companies in this article

Related Content

  • Montreal’s Champlain Bridge opens but late and over-budget
    June 27, 2019
    Montreal’s US$3.5-billion, 3.4km-long Samuel de Champlain Bridge has opened after four years of construction and months of delays, according to Canadian media reports. Work is continuing on the cycle and pedestrian paths and eventually a light-rail train will run down the middle of the six lane bridge over the St. Lawrence River. The new structure has a life-span of 125 years and runs alongside its namesake Champlain Bridge, a steel truss cantilever that opened in 1962 which will be demolished. Accord
  • Link-Belt unveils the next generation of its RTC-80110 Series II large rough terrain crane series
    January 6, 2017
    merican crane builder Link-Belt will be showing off the latest in its line of mid-range rough terrain cranes at Bauma, the RTC-8080 Series II, which offers a fully-powered, four-section, 38.7 m (127 ft) long main boom. The RTC-8080 Series II has a two-mode telescope proportioning system known as A-max and three on-board fly options allow operators to use at least four manual offset positions fixed at 2, 15, 30, and 45 degrees. One of the three on-board fly offerings is a 3-piece, bi-fold lattice fly, which
  • Link-Belt unveils the next generation of its RTC-80110 Series II large rough terrain crane series
    March 27, 2013
    merican crane builder Link-Belt will be showing off the latest in its line of mid-range rough terrain cranes at Bauma, the RTC-8080 Series II, which offers a fully-powered, four-section, 38.7 m (127 ft) long main boom. The RTC-8080 Series II has a two-mode telescope proportioning system known as A-max and three on-board fly options allow operators to use at least four manual offset positions fixed at 2, 15, 30, and 45 degrees. One of the three on-board fly offerings is a 3-piece, bi-fold lattice fly, which
  • Intermat Observatory report: road spending will dominate for 30 years
    April 23, 2018
    Road spending will dominate global infrastructure investment for the next 30 years, says a new report released at Intermat Paris 2018. According to a research project commissioned in partnership with Business France, the exhibition’s Observatory programme has revealed that €925 billion of investment is planned in Europe between now and 2050, and “the sector offering the highest development potential is roads”. Railways and buildings are the second and third biggest growth areas in Europe, the report adds.