Skip to main content

Work soon to start on Bosnia’s Hranjen Tunnel

Work is expected to start soon on Bosnia’s Hranjen Tunnel, part of the future Goražde-to-Sarajevo highway. Gorazde Emir Okovic, head of the Podrinje Canton, told Bosnian media despite recent poor weather construction of the road is proceeding. Cost of the six-kilometre double-tube tunnel will be around €92 million with phase one amounting to nearly €36 million. The tunnel will cut the journey between the two towns from 95km to 56km and the time from 90 minutes to 45 minutes.
February 27, 2019 Read time: 1 min
Work is expected to start soon on Bosnia’s Hranjen Tunnel, part of the future Goražde-to-Sarajevo highway.


Gorazde Emir Okovic, head of the Podrinje Canton, told Bosnian media despite recent poor weather construction of the road is proceeding.

Cost of the six-kilometre double-tube tunnel will be around €92 million with phase one amounting to nearly €36 million.

The tunnel will cut the journey between the two towns from 95km to 56km and the time from 90 minutes to 45 minutes.

Related Content

  • Colombia’s Toyo Tunnel project providing key link
    May 20, 2016
    Colombia’s Toyo Tunnel project will provide an important new link for the country, writes Mauro Nogarin. The new Toyo Tunnel project is of immense importance for Colombia, improving transportation and providing an important road link. The work is being carried out by the Antioquia to the Sea Consortium, which comprises of FCC Construction, Cass Builders and Company, Carlos Alberto Solarte and Estyma Studies and Handling. These firms are building the Toyo Tunnel project and the various access roads, with the
  • FCC Corredor de las Playas wins Panama Inter-American Highway deal
    November 21, 2017
    The consortium FCC Corredor de las Playas I has won the contract to widen the first section of the Inter-American Highway. FCC Corredor de las Playas I consists of FCC Construcción and CICSA – the infrastructures and construction division of the Grupo Carso. The Inter-American Highway will be widened along nearly 38km to six lanes between La Chorrera and Santa Cruz in the province of Panama Oeste in Panama at a cost of around US$543 million, according to the consortium. The project includes enlarging the
  • Construction of Fehmarn Belt Link could start in 2019
    February 27, 2018
    Construction of a Fehmarn Belt Link could start a year from now – more than a year ahead of schedule, according to Danish media reports. The timing was put forward by Holger Schou Rasmussen, chairman of Femernbælt Development, and Kristian Pihl Lorenzen, the Liberal Party spokesman for traffic issues. They reportedly said that a pending environmental court case in Germany that has stalled approval by German authorities won’t hold up construction of the 18km crossing as much as had been feared. As late as
  • Bulgaria continues with Struma motorway, Blagoevgrad to Krupnik
    September 14, 2017
    Bulgaria has started work on a 12.6km section of Struma motorway between the southwestern towns of Blagoevgrad and Krupnik. A consortium led by Bulgarian construction company Agromah is building the section under a contract worth just over €71 million, according to the regional development ministry.