Skip to main content

Work soon to start on Bosnia’s Hranjen Tunnel

Work is expected to start soon on Bosnia’s Hranjen Tunnel, part of the future Goražde-to-Sarajevo highway. Gorazde Emir Okovic, head of the Podrinje Canton, told Bosnian media despite recent poor weather construction of the road is proceeding. Cost of the six-kilometre double-tube tunnel will be around €92 million with phase one amounting to nearly €36 million. The tunnel will cut the journey between the two towns from 95km to 56km and the time from 90 minutes to 45 minutes.
February 27, 2019 Read time: 1 min
Work is expected to start soon on Bosnia’s Hranjen Tunnel, part of the future Goražde-to-Sarajevo highway.


Gorazde Emir Okovic, head of the Podrinje Canton, told Bosnian media despite recent poor weather construction of the road is proceeding.

Cost of the six-kilometre double-tube tunnel will be around €92 million with phase one amounting to nearly €36 million.

The tunnel will cut the journey between the two towns from 95km to 56km and the time from 90 minutes to 45 minutes.

Related Content

  • Colombia tunnel project conclusion plan
    December 6, 2016
    Tendering is commencing for the final portion of works to complete Colombia’s La Linea tunnel project. Around 12% of the work on the tunnel still has to be completed, with the work expected to cost US$68.5 million. The tender is being carried out by Colombia's National Road Institute (Invias). The tunnel project has been delayed for a series of reasons. Colombian contractor Constructora Carlos Collins was constructing the tunnel but did not meet the necessary deadline. As a result, Invias opted to open the
  • Positive finding for tunnel solution in Malta
    May 2, 2012
    A preliminary study on the proposed tunnel connecting the islands of Malta and Gozo has been carried out by Mott Macdonald. Mott Macdonald’s preliminary analysis of the Malta-Gozo undersea road link suggests that it would take 5-7 years to build a tunnel between the two islands. This report suggests a cost of €156-€492 million for a single bore three-lane tunnel on the shortest practical alignment route. Potentially, the project could be co-financed by the EU under the Cohesion Fund if a road tunnel link be
  • Bypass planning for Salo in Finland
    November 21, 2022
    Cost of the 4km project, includes eight bridges, is an estimated €40 million.
  • Date set to complete D1 Višňové Tunnel section
    July 20, 2023
    The D1 section between Lietavská Lúčka and Dubná Skala in Slovakia includes the partially completed 7.5km twin-tube Višňové Tunnel - to be the country's longest.