Skip to main content

Work soon to start on Bosnia’s Hranjen Tunnel

Work is expected to start soon on Bosnia’s Hranjen Tunnel, part of the future Goražde-to-Sarajevo highway. Gorazde Emir Okovic, head of the Podrinje Canton, told Bosnian media despite recent poor weather construction of the road is proceeding. Cost of the six-kilometre double-tube tunnel will be around €92 million with phase one amounting to nearly €36 million. The tunnel will cut the journey between the two towns from 95km to 56km and the time from 90 minutes to 45 minutes.
February 27, 2019 Read time: 1 min
Work is expected to start soon on Bosnia’s Hranjen Tunnel, part of the future Goražde-to-Sarajevo highway.


Gorazde Emir Okovic, head of the Podrinje Canton, told Bosnian media despite recent poor weather construction of the road is proceeding.

Cost of the six-kilometre double-tube tunnel will be around €92 million with phase one amounting to nearly €36 million.

The tunnel will cut the journey between the two towns from 95km to 56km and the time from 90 minutes to 45 minutes.

Related Content

  • Tunnel contract for Bosnian highway
    December 17, 2012
    Turkish company Cengiz Insaat has reportedly been awarded the €115 million contract for the construction of the Suhodol-Tarcin motorway in Bosnia. The works, which will be done in cooperation with Bosnian company Euroasfalt, will include two tunnels. One of them will be 400m long, while the other will be 2.5km. Works are expected to be completed by 2014. Meanwhile, bids are now being offered for a major highway project in Bosnia. This follows the opening of the tender process for the project by Bosnian high
  • Sydney’s new tunnel link opening
    July 10, 2020
    Sydney’s new tunnel link is now opening to traffic.
  • Concerns over bidding for Pocitelj Bridge work surface in Bosnia
    January 12, 2017
    A Bosnian minister has expressed concern over the difference between bids by two consortia for a motorway project that includes construction of the Pocitelj Bridge. Bosnia's state-owned motorway company Autoceste FBiH said in May that it had signed a contract worth nearly €108 million with the joint venture of Euroasfalt and Strabag for construction of the 5.8km Klopce-Donja Gracanica subsection of pan-European transport Corridor Vc. A report by the Bosnian news agency Fena said that Bosnia's deputy m
  • Bosnia tunnel tender opening for bidding
    July 18, 2019
    The tender process is opening in Bosnia for a key tunnel project. The new Racin to Ivan Tunnel section will form part of the important Corridor 5C route. Financing for the project is being provided by the European Investment Bank (EIB). The work is expected to cost €50 million and the project will be managed by Bosnia’s state-owned road business, Autoceste FbiH.