Skip to main content

Work on Serbia’s Corridor 10 highway is on track

In Serbia work on the Corridor 10 highway looks set to be completed as planned in 2016. Serbian roads company, Koridori Srbije, says that that the Corridor 10 motorway should be completed by the middle of 2016. The World Bank (WB) mission visited building sites on Corridor 10 and said that considerable progress has been made, with an additional 23% of works having been carried out in the last 18 month period. In 2014 alone, 50km of the route will be completed. Work is being carried out on 238 bridges, out o
April 3, 2014 Read time: 2 mins
In Serbia work on the Corridor 10 highway looks set to be completed as planned in 2016. Serbian roads company, 3235 Koridori Srbije, says that that the Corridor 10 motorway should be completed by the middle of 2016. The 2332 World Bank (WB) mission visited building sites on Corridor 10 and said that considerable progress has been made, with an additional 23% of works having been carried out in the last 18 month period. In 2014 alone, 50km of the route will be completed. Work is being carried out on 238 bridges, out of which 144 are expected to be completed in 2014 and the remainder in 2015. Meanwhile, a tender has been called for the Dimitrovgrad ringroad, which is due to be completed by 25th April 2014. Previously, Koridori Srbije signed works worth €59.3 million with the Austrian company 2859 Alpine. However, the deal was cancelled after Alpine hit major financial problems. In addition, work on Serbia’s Corridor 11 is being carried out faster than originally planned. Preparations for the contracts covering the Obranovac-Surcin and Pozega-Preljina sections are being made at present. The tender process is expected to open within six weeks. The value of the two highway sections has not been revealed at this stage.

For more information on companies in this article

Related Content

  • Funding problems for Bosnia's highway project
    May 14, 2012
    The Bosnian autonomous entity Republika Srpska recently cancelled a highway contract with Austrian construction company Strabag. The problem arose from alleged “irregularities” that saw the contract being awarded directly to Strabag without the work being put out for tender. Because of this, international financial institutions such as the European Bank for Reconstruction and Development (EBRD) have said they will not fund the project.
  • China's Exim Bank to approve US$ 1.1bn to build Serbia’s Corridor 11 motorway
    October 2, 2012
    The Serbian government has reported that it is planning to sign a loan agreement with China's Exim Bank for new loans worth US$ 1.1 billion for construction of the Corridor 11 motorway. Minister of Finance, Mladan Dinkic, said that the loan will be used for construction of the Belgrade-Ljig and Pojate Preljina motorway parts. The contract agreement is due to be signed by the end of 2012 or beginning of 2013. Works are expected to start sometime next year.
  • Russia’s US$28 billion road and bridge works
    November 29, 2013
    A series of major transport projects worth a combined value of over US$28 billion are set to significantly enhance connectivity between various parts of Russia. These include the Moscow-St Petersburg highway, work to the transport system in the Rostov region and two new bridges: one over the Belaya river in Ufa, the other over the Kama river in Izhevsk. The tender process for the $4.46 billion contract to build, maintain, repair, and operate a section of the Moscow- St Petersburg highway has been announc
  • Mostotrest won another tender for building of Moscow-St Petersburg highway
    February 20, 2014
    The award for a key stretch of the Moscow-St Petersburg highway has been awarded - Eugene Gerden writes As expected by analysts, Mostotrest, owned by the Rotenberg brothers, won the tender for the construction of the sixth and longest section of the Moscow-St Petersburg highway. Under the conditions of the tender the company will build 209km of the highway (334-543km), which will pass through the Tver and Novgorod regions of Russia. The cost of construction is 144.6 billion Rubles (US$4.51 billion), 16 bill