Skip to main content

Work resumes on Indonesian tollway

Construction work on Indonesia’s Bekasi-Jakarta toll road has recommenced after a break of close to 20 years. The work on the 21km Bekasi-Jakarta toll road was originally started by Kresna Kusuma Dyandra Marga (KKDM), a consortium headed by state-run Waskita Karya, with a 60% share in the package. However work on the project was stopped in the late 1990s due to the Asian financial crisis. The deal for the link will see KKDM operating the toll road, which is costing US$600 million. State funds worth some $2
October 22, 2014 Read time: 2 mins
Construction work on Indonesia’s Bekasi-Jakarta toll road has recommenced after a break of close to 20 years.  The work on the 21km Bekasi-Jakarta toll road was originally started by Kresna Kusuma Dyandra Marga (KKDM), a consortium headed by state-run Waskita Karya, with a 60% share in the package. However work on the project was stopped in the late 1990s due to the Asian financial crisis. The deal for the link will see KKDM operating the toll road, which is costing US$600 million. State funds worth some $29.2 million will pay for the necessary acquisition of land required for the work. The toll road construction will be carried out be in two sections; the 10km Jaka Sampurna-Duren Jaya stretch; the 11km Casablanca-Jaka Sampurna stretch. Completion of the $325 million Casablanca-Jaka Sampura section is due within 36 months. Of the funding required for this section, 70% will be from bank loans Waskita providing the rest.

Related Content

  • Road transport key to Africa's trade links
    February 17, 2012
    Road transport is the key to improving Africa's links within its own territory, and further afield as Patrick Smith reports. Development of road transportation is the key to the future of the African economy, and countries on the continent are making great strides. According to a report by a transport infrastructure expert at the New Partnership for Africa's Development (NEPAD), within the next 15 years the value of trade in Africa could reach US$250 billion if a $32 billion investment is made to integrate
  • Serbia reduces cost of highway construction
    March 22, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget.
  • Funding for Indonesia’s new capital
    February 6, 2025
    Funding is being secured for the construction of Indonesia’s new capital.
  • Trimble technology could slice a third off the new highway costs in Indonesia’s US$400 billion infrastructure plan
    February 21, 2014
    Cutting-edge Sandvik Construction equipment is said to be giving ambitious Argentinian quarry firm Canteras Amadeo a commercial advantage .Starting life as a one-quarry enterprise in Córdoba, Argentina, in 1999, Canteras Amadeo is a flourishing business with additional operations in Cordoba and Santiago del Estero. Key to its success is said to be its owners’ embrace of technological improvement, and their choice of Sandvik equipment to improve their processes.