Skip to main content

Work resumes on Indonesian tollway

Construction work on Indonesia’s Bekasi-Jakarta toll road has recommenced after a break of close to 20 years. The work on the 21km Bekasi-Jakarta toll road was originally started by Kresna Kusuma Dyandra Marga (KKDM), a consortium headed by state-run Waskita Karya, with a 60% share in the package. However work on the project was stopped in the late 1990s due to the Asian financial crisis. The deal for the link will see KKDM operating the toll road, which is costing US$600 million. State funds worth some $2
October 22, 2014 Read time: 2 mins
Construction work on Indonesia’s Bekasi-Jakarta toll road has recommenced after a break of close to 20 years.  The work on the 21km Bekasi-Jakarta toll road was originally started by Kresna Kusuma Dyandra Marga (KKDM), a consortium headed by state-run Waskita Karya, with a 60% share in the package. However work on the project was stopped in the late 1990s due to the Asian financial crisis. The deal for the link will see KKDM operating the toll road, which is costing US$600 million. State funds worth some $29.2 million will pay for the necessary acquisition of land required for the work. The toll road construction will be carried out be in two sections; the 10km Jaka Sampurna-Duren Jaya stretch; the 11km Casablanca-Jaka Sampurna stretch. Completion of the $325 million Casablanca-Jaka Sampura section is due within 36 months. Of the funding required for this section, 70% will be from bank loans Waskita providing the rest.

Related Content

  • Indonesian tolled highway projects face delays
    February 15, 2016
    Delays look likely for Indonesia’s massive toll-road development programme. Funding shortages for the necessary land acquisitions will hold back commencement of highway construction activity. In all over US$18.1 billion has been set aside by the Public Works and Public Housing Ministry for the necessary land purchases. But this sum is insufficient for the massive land areas required. The ambitious programme of works has called for the construction of 1,000km of tolled highways by 2019. Additional funding wi
  • Morocco motorway widening work underway
    March 13, 2020
    Widening work is now underway for key Morocco motorway links.
  • More funding needed for key Indonesian project
    July 27, 2023
    More funding is needed for a key Indonesian road project.
  • Kenya develops annuity road funding model
    May 8, 2015
    Kenya is introducing novel methods for funding its necessary road infrastructure development - Shem Oirere writes. Kenya has unveiled a new financing model for road construction and reviewed its design standards and construction methodologies, which forms part of a new strategy for the East African country. Under this new plan Kenya is planning to upgrade 10,000km of road, with these links featuring asphalt surfacing; the work being carried out over the next five years at a cost of US$2.8 billion. Despite t