Skip to main content

Work resumes on Indonesian tollway

Construction work on Indonesia’s Bekasi-Jakarta toll road has recommenced after a break of close to 20 years. The work on the 21km Bekasi-Jakarta toll road was originally started by Kresna Kusuma Dyandra Marga (KKDM), a consortium headed by state-run Waskita Karya, with a 60% share in the package. However work on the project was stopped in the late 1990s due to the Asian financial crisis. The deal for the link will see KKDM operating the toll road, which is costing US$600 million. State funds worth some $2
October 22, 2014 Read time: 2 mins
Construction work on Indonesia’s Bekasi-Jakarta toll road has recommenced after a break of close to 20 years.  The work on the 21km Bekasi-Jakarta toll road was originally started by Kresna Kusuma Dyandra Marga (KKDM), a consortium headed by state-run Waskita Karya, with a 60% share in the package. However work on the project was stopped in the late 1990s due to the Asian financial crisis. The deal for the link will see KKDM operating the toll road, which is costing US$600 million. State funds worth some $29.2 million will pay for the necessary acquisition of land required for the work. The toll road construction will be carried out be in two sections; the 10km Jaka Sampurna-Duren Jaya stretch; the 11km Casablanca-Jaka Sampurna stretch. Completion of the $325 million Casablanca-Jaka Sampura section is due within 36 months. Of the funding required for this section, 70% will be from bank loans Waskita providing the rest.

Related Content

  • Slovakia tunnel sections underway but some delays
    January 23, 2018
    The route for new tunnel links for Slovakia’s D1 highway has been agreed. New tunnels now look set to be built on the 13.5km stretch between Turany and Hubova section of the D1 highway. This plan calls for the construction of the Korbelka and Havran tunnels at an estimated cost of €900 million. Building these two links would bypass the Lower Fatra mountain range, with the Korbelka Tunnel measuring 5.9km and the Havran Tunnel measuring 2.9km long. The Slovak Environment Ministry rejected an appeal against th
  • Indonesia toll road tender bdding
    July 28, 2015
    Indonesia’s state-owned toll operator, Jasa Marge, is bidding for two major toll road projects. The toll road operating concessions are for the Balikpapan-Samarinda and Manado-Bitung routes. The 99m Balikpapan-Samarinda toll road will connect capital Jakarta with East Kalimantan province. By 2018, the 39km Manado-Bitung toll road will run between the western and eastern parts of North Sulawesi. Jasa Marga has also found the financing necessary to fund the Medan-Kuala Namu-Tebing Tinggi toll road in Deli
  • Indonesian toll bridge tender
    March 16, 2012
    The tender process for Indonesia’s Suramadu bridge project will be reopened.
  • Morocco highway works planned
    January 28, 2021
    Morocco highway works are being planned.