Skip to main content

Work restarting for airport link tunnel in Perth, Australia

Tunnel driving work is now recommencing on the new link that will connect Perth, Australia with Forrestfield Airfield. Work was halted for two months when first one and then the other TBM being used encountered unexpected geological problems. The geological issues have now been addressed and one of the TBMs is being restarted, with the second also expected to recommence tunnel driving work in a few weeks. In all, the project is costing US$1.4 billion (A$1.8 billion). The new link is expected to reduce
April 19, 2018 Read time: 1 min

Tunnel driving work is now recommencing on the new link that will connect Perth, Australia with Forrestfield Airfield. Work was halted for two months when first one and then the other TBM being used encountered unexpected geological problems. The geological issues have now been addressed and one of the TBMs is being restarted, with the second also expected to recommence tunnel driving work in a few weeks. In all, the project is costing US$1.4 billion (A$1.8 billion). The new link is expected to reduce journey times to and from the Forrestfield facility, as well as helping to reduce congestion in Perth, particularly at peak periods.

Related Content

  • Effective stabilisation
    February 24, 2012
    Contractor BAM Nuttall and specialist piling sub contractor Aarsleff Piling, have been working closely to develop a cost-effective solution to a tricky piling problem. The two firms have developed an alternative and versatile technique to reduce the risk of delays installing 2,150 precast concrete piles along part of the route of an innovative guided busway in Cambridgeshire in the UK.
  • North Carolina expressway opening to traffic
    December 6, 2018
    The new Monroe Expressway in North Carolina is now opening for drivers, which will cut journey times for many drivers in the city of Charlotte. Costing an estimated US$800 million, the 32km route lies to the South East of Charlotte and runs parallel to US-74 south of the I-485 route running around the city. The new road link utilises electronic tolling and connects Marshville with Stallings.
  • Lower traffic emissions in London
    May 20, 2019
    London’s ultra-low emission zone (ULEZ) system is already proving successful. In the first month since the scheme was introduced, the number of non-compliant vehicles entering the charging zone has been reduced by 9,400/day, a drop of 26%. According to the latest research, 74% of vehicles entering the ULEZ have been in compliance with the emission requirements.
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the