Skip to main content

Work restarting for airport link tunnel in Perth, Australia

Tunnel driving work is now recommencing on the new link that will connect Perth, Australia with Forrestfield Airfield. Work was halted for two months when first one and then the other TBM being used encountered unexpected geological problems. The geological issues have now been addressed and one of the TBMs is being restarted, with the second also expected to recommence tunnel driving work in a few weeks. In all, the project is costing US$1.4 billion (A$1.8 billion). The new link is expected to reduce
April 19, 2018 Read time: 1 min

Tunnel driving work is now recommencing on the new link that will connect Perth, Australia with Forrestfield Airfield. Work was halted for two months when first one and then the other TBM being used encountered unexpected geological problems. The geological issues have now been addressed and one of the TBMs is being restarted, with the second also expected to recommence tunnel driving work in a few weeks. In all, the project is costing US$1.4 billion (A$1.8 billion). The new link is expected to reduce journey times to and from the Forrestfield facility, as well as helping to reduce congestion in Perth, particularly at peak periods.

Related Content

  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Partners win highway operation deal in New South Wales, Australia
    January 11, 2016
    Egis Projects and its partner Fulton Hogan Construction have won a major contract for the operation and maintenance of the WestConnex highway link in New South Wales Australia. The package was awarded by Sydney Motorway Corporation (SMC) to Fulton Hogan Egis O&M (FHEO&M). The partners hold equal 50% shares in the project. Egis has its share in the Australian project through its Australian subsidiary Egis Projects Asia Pacific.
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during