Skip to main content

Work restarting for airport link tunnel in Perth, Australia

Tunnel driving work is now recommencing on the new link that will connect Perth, Australia with Forrestfield Airfield. Work was halted for two months when first one and then the other TBM being used encountered unexpected geological problems. The geological issues have now been addressed and one of the TBMs is being restarted, with the second also expected to recommence tunnel driving work in a few weeks. In all, the project is costing US$1.4 billion (A$1.8 billion). The new link is expected to reduce
April 19, 2018 Read time: 1 min

Tunnel driving work is now recommencing on the new link that will connect Perth, Australia with Forrestfield Airfield. Work was halted for two months when first one and then the other TBM being used encountered unexpected geological problems. The geological issues have now been addressed and one of the TBMs is being restarted, with the second also expected to recommence tunnel driving work in a few weeks. In all, the project is costing US$1.4 billion (A$1.8 billion). The new link is expected to reduce journey times to and from the Forrestfield facility, as well as helping to reduce congestion in Perth, particularly at peak periods.

Related Content

  • 2010 GRAA Winner Profiles
    April 12, 2012
    Our series of profiles on winning projects from the 2010 Global Road Achievement (GRAA) Awards continues with the Construction Methodology Category won by Barrier Systems/Utah Department of Transportation With any major road construction project, the disruption of traffic flow is of paramount concern for engineers, workers and travellers, particularly as it relates to increased traffic delays and the safety of those driving through the work zone. In the state of Utah, USA, work was recently completed on
  • Herrenknecht’s benefits from Indian orders
    November 30, 2012
    German company Herrenknecht says that in recent months it has received 18 orders from India for tunnel boring machines (TBMs) for projects to expand metro networks in the Indian cities of Delhi, Bangalore, Chennai and Kolkata, and for water supply schemes. Earlier this year an Indian record of 525m of drilled and secured tunnel was achieved in one month on the Veligonda water project (state of Andhra Pradesh) with a Herrenknecht Double Shield TBM (diameter 7.9m). The 18km Veligonda Tunnel is part of a sche
  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta
  • Improving safety for cyclists
    November 29, 2013
    New systems in development for protecting vulnerable road users - Mike Woof writes In many European countries the number of people using bicycles for commuting are increasing. This is being actively encouraged by city authorities as it offers an effective way to reduce traffic congestion, lower exhaust emissions and also improve public health. The Netherlands and Denmark have long had high percentages of commuters opting to use bicycles and other European countries are looking to capitalise on the experienc