Skip to main content

Work restarting for airport link tunnel in Perth, Australia

Tunnel driving work is now recommencing on the new link that will connect Perth, Australia with Forrestfield Airfield. Work was halted for two months when first one and then the other TBM being used encountered unexpected geological problems. The geological issues have now been addressed and one of the TBMs is being restarted, with the second also expected to recommence tunnel driving work in a few weeks. In all, the project is costing US$1.4 billion (A$1.8 billion). The new link is expected to reduce
April 19, 2018 Read time: 1 min

Tunnel driving work is now recommencing on the new link that will connect Perth, Australia with Forrestfield Airfield. Work was halted for two months when first one and then the other TBM being used encountered unexpected geological problems. The geological issues have now been addressed and one of the TBMs is being restarted, with the second also expected to recommence tunnel driving work in a few weeks. In all, the project is costing US$1.4 billion (A$1.8 billion). The new link is expected to reduce journey times to and from the Forrestfield facility, as well as helping to reduce congestion in Perth, particularly at peak periods.

Related Content

  • Caterpillar eyes better performance in 2015 amid stormy weather
    May 13, 2015
    Caterpillar vice president Paolo Fellin sums up the past year for the global equipment manufacturer and looks at the increasing importance of telematics and machine control. David Arminas reports from Caterpillar’s Demonstration and Learning Centre in Malaga, southern Spain First the good news. Despite the difficulties, especially of the financial markets, 2014 was “a record year for a lot of things” for global heavy equipment maker Caterpillar.Now the bad news. Hang onto your seats because despite some
  • Stonehenge tunnel preferred bidder announced
    May 27, 2022
    The preferred bidder has been announced for the UK’s Stonehenge tunnel.
  • India’s key tunnel project attracts new bidding
    June 5, 2017
    India’s massive Zojila Tunnel project in Jammu & Kashmir is attracting new bidding. The National Highways & Infrastructure Development Corporation (NHIDC) is asking for new bids for the project. A number of Indian and international firms are expected to enter bids, with some planning join ventures for the work, which is expected to cost US$1.55 billion.
  • Alabama bridge project being proposed again
    December 29, 2021
    Proposals have been made for a new Alabama bridge project.