Skip to main content

Work to restart on key Algerian highway section

Work looks set to restart on a key section of Algeria’s East-West highway. The country's national highways agency, the ANA, has issued the Japanese group Cojaal with a second formal request to restart work on a 359km section of the highway. Cojaal, along with the Chinese firm Citic-CRCC had been contracted to build 900km of the highway, which links the west of the country with the east. The Chinese section of the highway has been completed (although it was delayed) but Cojaal has yet to finish its section o
June 18, 2014 Read time: 2 mins
Work looks set to restart on a key section of Algeria’s East-West highway. The country's national highways agency, the ANA, has issued the Japanese group Cojaal with a second formal request to restart work on a 359km section of the highway. Cojaal, along with the Chinese firm Citic-CRCC had been contracted to build 900km of the highway, which links the west of the country with the east. The Chinese section of the highway has been completed (although it was delayed) but Cojaal has yet to finish its section of the route. Both technical and financial issues have caused delays to Cojaal’s work. The highway has been beset by problems linked to expropriation of land as well as the need to reroute public utilities. There have also been claims of problems with the feasibility study.

Related Content

  • China's economic growth fuelling vehicle increase
    February 21, 2012
    China is at a turning point in many ways. The country's continuing economic growth is fuelling a massive increase in vehicle numbers, with no signs of slackening. This is most acute and most visible in major cities such as Beijing and Shanghai, where traffic jams are now a frequent occurrence
  • China's economic growth fuelling vehicle increase
    March 14, 2012
    China is at a turning point in many ways. The country's continuing economic growth is fuelling a massive increase in vehicle numbers, with no signs of slackening. This is most acute and most visible in major cities such as Beijing and Shanghai, where traffic jams are now a frequent occurrence. One recent Beijing tailback stretched nearly 100km along a major highway and was caused by roadworks at a particularly busy stretch of the road.
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor
  • Armenia north-south highway route
    October 9, 2017
    Plans are being drawn up in Armenia for the new North-South Highway project.