Skip to main content

Work planned for key Nigerian highway links

In Nigeria plans are in hand for the rebuilding of two key connections, the Lagos-Badagry Expressway and the Oshodi-Apapa Expressway. Contractor Julius Berger is carrying out the work on the Oshodi-Apapa Expressway and this should be complete before the end of 2014. Meanwhile Lagos State looks set to handle the widening and improvement work required for the Lagos-Badagry Expressway project. At the moment the Lagos-Badagry Expressway features two lanes in either direction, however this is proving unable to c
October 22, 2014 Read time: 1 min
In Nigeria plans are in hand for the rebuilding of two key connections, the Lagos-Badagry Expressway and the Oshodi-Apapa Expressway. Contractor 7740 Julius Berger is carrying out the work on the Oshodi-Apapa Expressway and this should be complete before the end of 2014. Meanwhile Lagos State looks set to handle the widening and improvement work required for the Lagos-Badagry Expressway project. At the moment the Lagos-Badagry Expressway features two lanes in either direction, however this is proving unable to cope with traffic volumes and the plans call for the link to be widened, with five lanes in either direction. The project would also encompass dedicated bus lanes as well as a light rail link. The cost of the Lagos-Badagry Expressway upgrade project has yet to be revealed.

For more information on companies in this article

Related Content

  • Lithuania highway work due
    November 10, 2022
    Lithuania highway works are due.
  • Bitumen technology: counting carbon emissions from road works
    March 13, 2024
    This month we look at accurate carbon counting, a biobinder that does not come at a premium and efforts to increase recycled content - Kristina Smith reports
  • Widening work for WA
    February 16, 2012
    Widening work in Western Australia (WA) will commence on a key highway link in June of this year.
  • Contraflow with Mike Woof
    August 2, 2012
    ‘Before I get down to this month’s main agenda, I’d like to draw your attention to a range of improvements that we’ve made to the content of World Highways. In conjunction with a fresher look, we have introduced features both long and short: At the ‘long’ end of the scale in our World Report…this month the subject is Australian roads…and at the ‘short’ end of the scale is the five-minute interview with an industry personality. Our equipment features have been beefed up with more analysis, and the signpostin