Skip to main content

Work on a key tunnel link in Bosnia is moving ahead according to schedule

Work is on schedule for a new tunnel for the Corridor Vc highway in Bosnia and Herzogovina. The link will be from Drivusa to Kakanj and is due for completion in February 2014. The project is worth some €62 million. The contract is being carried out by Slovenian firm Primorje.
April 11, 2012 Read time: 1 min
Work is on schedule for a new tunnel for the Corridor Vc highway in Bosnia and Herzogovina. The link will be from Drivusa to Kakanj and is due for completion in February 2014. The project is worth some €62 million. The contract is being carried out by Slovenian firm 2476 Primorje.

For more information on companies in this article

Related Content

  • Bulgaria road tunnel tender recommencing
    June 20, 2017
    The tender process for a tunnel project on Bulgaria’s Struma Highway is now reopening. The project did go to tender earlier this year but has now had to be restarted following unexpected technical issues.
  • Ed Zublin to start Kriegsstraße car tunnel work in Karlsruhe
    April 28, 2017
    Construction officially started on a two-lane 1.6km road tunnel in the centre of the German city of Karlsruhe. In December, the Stuttgart-based civil engineering subsidiary Ed Züblin announced that it is leading a consortium with Schleith to build the Kriegsstraße car tunnel in the German city of Karlsruhe. Ed Zublin is now a wholly owned subsidiary of the Austria-based contractor Strabag. The tunnel in Kriegsstraße is the second part of the Kombilösung public transport infrastructure project to reduce the
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.