Skip to main content

Work commencing on key Nepal tunnel connection

Work is starting in Nepal on a new tunnel project worth some US$347 million. The new tunnel forms part of the 58km route between Hetauda and Kathmandu. The project developer is Nepal Purbadhar Bikas (NPBCL) and the tunnel is being built at Bhimphedi in Makwanpur. The new route will reduce the journey time between Hetauda and Kathmandu from six hours at present to just one hour when the tunnel opens to traffic in December 2016. Once the new route is open it is also expected to improve traffic safety as the e
November 15, 2013 Read time: 1 min
Work is starting in Nepal on a new tunnel project worth some US$347 million. The new tunnel forms part of the 58km route between Hetauda and Kathmandu. The project developer is Nepal Purbadhar Bikas (NPBCL) and the tunnel is being built at Bhimphedi in Makwanpur. The new route will reduce the journey time between Hetauda and Kathmandu from six hours at present to just one hour when the tunnel opens to traffic in December 2016. Once the new route is open it is also expected to improve traffic safety as the existing road poses risks to drivers. The construction work is expected to be challenging due to the location of the site however.

Related Content

  • $1 billion Bengaluru road tunnel
    June 25, 2025
    A $1 billion Bengaluru road tunnel project is planned.
  • Solution found for Colombian tunnel project?
    March 12, 2015
    A solution seems to have been found for Colombia’s long-running La Linea Tunnel project. Work has been delayed on the tunnel for a number of reasons and on a number of occasions, most recently due to funding issues. But previous delays were due to such diverse causes as technical challenges posed by the difficult conditions and a lack of suitable insurance cover. The Colombian Government has come to an agreement with the Segundo Centenario consortium building the tunnel that will see construction activity r
  • Istanbul’s new tunnel connection opens
    December 22, 2016
    Istanbul’s new Eurasia Tunnel has been opened for traffic, connecting the Asian and European side of the Bosporus strait. The new link will help reduce congestion in Istanbul and should cut travel times to just 15 minutes for drivers using the link. The tunnel runs from Kazlıçeşme on the European side to Göztepe on the Asian side of the Bosporus strait. The new route is 14.5km long, with a 5.4km tunnel stretch lying up to 106m below the Bosporus Strait and features two decks for vehicles and it is expect
  • India pushing ahead with infrastructure projects
    July 4, 2012
    Despite the economic downturn, India looks to be pressing ahead with its major infrastructure projects to further boost its incredible growth. Patrick Smith reports India, which like most countries has been affected by the current economic climate, although not to the same extent, is pressing ahead with its ambitious highway construction plans. Each week new projects are completed, started or awarded as the nation seeks to improve its transportation requirements. These are needed to meet the aspirations of