Skip to main content

Work on Algeria’s 1,000km Hauts-Plateaux motorway to begin this month

The Algerian Minister for Public Works, Farouk Chiali, has said that the 1,000km-long Hauts-Plateaux motorway project will begin this month, with the cost of constructing the route reaching US$8.94 billion (DZD 700 billion). Chiali said local firms will carry out the works exclusively, with the project having been divided into ten sections. Each section, requiring 36 months of work, will be attributed to a different consortium of Algerian firms. If work begins on each section at the same time, the project
February 26, 2014 Read time: 1 min
The Algerian Minister for Public Works, Farouk Chiali, has said that the 1,000km-long Hauts-Plateaux motorway project will begin this month, with the cost of constructing the route reaching US$8.94 billion (DZD 700 billion).

Chiali said local firms will carry out the works exclusively, with the project having been divided into ten sections. Each section, requiring 36 months of work, will be attributed to a different consortium of Algerian firms. If work begins on each section at the same time, the project could be completed in less than three years.

Related Content

  • Dubai infrastructure development
    March 24, 2017
    New infrastructure is being built in Dubai with the help of machines from Volvo CE The Dubai Water Canal is being built in a busy and congested urban area, with the project including construction of major new road bridge crossings. The work is being carried out by Turkish infrastructure specialist DETECH Contracting. The 3.2km waterway is being built through downtown Dubai and is among the most ambitious projects being carried out in the country. When fully opened in 2017 the project – called The Duba
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a