Skip to main content

Work on Algeria’s 1,000km Hauts-Plateaux motorway to begin this month

The Algerian Minister for Public Works, Farouk Chiali, has said that the 1,000km-long Hauts-Plateaux motorway project will begin this month, with the cost of constructing the route reaching US$8.94 billion (DZD 700 billion). Chiali said local firms will carry out the works exclusively, with the project having been divided into ten sections. Each section, requiring 36 months of work, will be attributed to a different consortium of Algerian firms. If work begins on each section at the same time, the project
February 26, 2014 Read time: 1 min
The Algerian Minister for Public Works, Farouk Chiali, has said that the 1,000km-long Hauts-Plateaux motorway project will begin this month, with the cost of constructing the route reaching US$8.94 billion (DZD 700 billion).

Chiali said local firms will carry out the works exclusively, with the project having been divided into ten sections. Each section, requiring 36 months of work, will be attributed to a different consortium of Algerian firms. If work begins on each section at the same time, the project could be completed in less than three years.

Related Content

  • Indonesia set for major PPP infrastructure tendering round
    March 10, 2015
    The Indonesian government is getting ready to tender for major infrastructure projects including roads to be developed under public-private partnership (PPP) contracts, the Jakarta Post reported. Public Works and Public Housing minister Basuki Hadimuljono said in Jakarta that the first priorities would be on the 94km Balikpapan-Samarinda toll road, the 7km Manado-Bitung toll road in North Sulawesi and a drinking water treatment system project in western Semarang, central Java. The projects will prove that P
  • Key projects in hand for India
    September 7, 2015
    The Indian Government plans to build a new highway connecting Katra with New Delhi. The route will be some 600km long, running through Punjab, Haryana, Jammu and Kashmir. A consultant is being selected to carry out a feasibility study for the project. The project will cost in the order of US$2.25 billion and will be of importance as Katra is where the Vaishno Devi holy shrine is located. The new link will reduce travel time on the route from 11-12 hours at present to five-six hours when the work is complete
  • Algeria’s East-West highway nearing completion
    August 12, 2015
    Work on Algeria’s long running East-West highway project should be complete by mid-October 2015. The Algerian Ministry for Public Works, has said that the final 120km of road should be ready by mid-October at the latest. This will be the last section of the final stretch of the 1,200km East-West highway to open to traffic. A number of delays have hit work on some sections of the highways due to issues such as technical problems and disputes with contractors. The East-West highway is of major importance for
  • Russia seeks outside investment in road building
    November 6, 2012
    The Russian road building industry is on the verge of big changes as it bids to improve quality and speed of construction says Eugene Gerden The Russian road building industry is on the verge of big changes as the national government considers creating conditions to attract foreign companies to build roads in the country. According to a recent order of President Vladimir Putin, due to poor quality and high cost of road construction, there is a need for the development of a mechanism to attract foreign compa