Skip to main content

Widening for key section of UK’s A11 route complete

Contractor Balfour Beatty has completed the €132.4 million (£105 million) upgrade of the last remaining single carriageway section of the A11. This section of the route runs between Barton Mills in Suffolk and Thetford in Norfolk. The work involved dualling nearly 15km of carriageway on behalf of the Highways Agency.
December 12, 2014 Read time: 2 mins
New A11 looking north, with the Elveden Memorial in the distance

Contractor 1146 Balfour Beatty has completed the €132.4 million (£105 million) upgrade of the last remaining single carriageway section of the A11. This section of the route runs between Barton Mills in Suffolk and Thetford in Norfolk. The work involved dualling nearly 15km of carriageway on behalf of the 2309 Highways Agency.

Main construction on the project started in January 2013 and the completed dual carriageway was officially opened by the Secretary of State for Transport, Patrick McLoughlin MP, at a ceremony attended by local stakeholders.

The scheme involved the widening of the strategic route linking Suffolk with Norfolk to dual two-lane standard along its length and included the construction of a 5.8km bypass to the north of Elveden village in Suffolk. It has also involved the construction of six major new bridge structures, forming either underpasses or overbridges.

330,000tonnes of earth were moved during the project, which also involved laying around 140,000tonnes of asphalt, lifting 1,500 tonnes of bridge steel work and pouring 4000 tonnes of concrete. Over 32km of drainage pipes and 50,000m3 of earth were replaced with gravel to take water away from the carriageway.

The scheme achieved 20% savings over its original projected cost as a result of nearly €25.2 million (£20 million) of savings by Balfour Beatty, including the avoidance of national grid and gas infrastructure diversions and the retention of more of the original A11 than originally anticipated. Some landscaping work will continue in the New Year and is due to be completed by the end of March 2015.

For more information on companies in this article

Related Content

  • China opens record-breaking bridge
    May 8, 2012
    China has opened the world's longest bridge over water, the 41.58km Jiaozhou Bay Bridge, which is said to have cost well over US$2 billion to build. It links the eastern port city of Qingdao to Huangdao Island across Jiaozhou Bay and is 4km longer than the previous longest bridge over water, the Lake Pontchartrain Causeway in Louisiana, USA. Opened in June, 2011 after four years of construction, the link is expected to carry some 30,000 vehicle/day and will reduce travel time by 30 minutes, although it is o
  • China looks to the future with major highway plans
    February 15, 2012
    China is still moving ahead with plans that will give it the world's biggest highway system. Patrick Smith reports. As China's economy grows even more, keeping the country on the move has become a priority for the government. While the country has made great strides over the past decade in improving its infrastructure, the number of vehicles has also increased rapidly, and in some instances restrictions have been placed on them.
  • Tunisia is benefiting from key highway expansion
    November 28, 2012
    Work is underway in Tunisia on the westbound Highway from capital Tunis towards the Algerian border. This 60km link will run from the town of Oued Zarga to Boussalem and the work is being carried out by Italian contractor Todini and local company Soroubat. The bidding process for the 100km highway from Gabes to Medenine is now being opened, while bidding for the 92km road from Medenine to the Libyan border outpost of Ras Jedir opened in October 2012. Bids for the construction of the 61km of peripheral roads
  • Major Polish highway projects being planned
    October 12, 2015
    Work on a series of major road projects is now gathering pace. The Polish General Directorate for National Roads and Motorways (GDDKiA) is signing contracts worth over €753.55 mIllion for the construction of two S7 dual carriageway sections. These will form part of the Gdansk-Warsaw route. Czech firm Metrostav will build the 20km section between Koszwaly and Nowy Dwor Gdanski. And Budimex will construct the 19km section between Nowy Dwor Gdanski and Kazimierzowo.