Skip to main content

Widening for key section of UK’s A11 route complete

Contractor Balfour Beatty has completed the €132.4 million (£105 million) upgrade of the last remaining single carriageway section of the A11. This section of the route runs between Barton Mills in Suffolk and Thetford in Norfolk. The work involved dualling nearly 15km of carriageway on behalf of the Highways Agency.
December 12, 2014 Read time: 2 mins
New A11 looking north, with the Elveden Memorial in the distance

Contractor 1146 Balfour Beatty has completed the €132.4 million (£105 million) upgrade of the last remaining single carriageway section of the A11. This section of the route runs between Barton Mills in Suffolk and Thetford in Norfolk. The work involved dualling nearly 15km of carriageway on behalf of the 2309 Highways Agency.

Main construction on the project started in January 2013 and the completed dual carriageway was officially opened by the Secretary of State for Transport, Patrick McLoughlin MP, at a ceremony attended by local stakeholders.

The scheme involved the widening of the strategic route linking Suffolk with Norfolk to dual two-lane standard along its length and included the construction of a 5.8km bypass to the north of Elveden village in Suffolk. It has also involved the construction of six major new bridge structures, forming either underpasses or overbridges.

330,000tonnes of earth were moved during the project, which also involved laying around 140,000tonnes of asphalt, lifting 1,500 tonnes of bridge steel work and pouring 4000 tonnes of concrete. Over 32km of drainage pipes and 50,000m3 of earth were replaced with gravel to take water away from the carriageway.

The scheme achieved 20% savings over its original projected cost as a result of nearly €25.2 million (£20 million) of savings by Balfour Beatty, including the avoidance of national grid and gas infrastructure diversions and the retention of more of the original A11 than originally anticipated. Some landscaping work will continue in the New Year and is due to be completed by the end of March 2015.

For more information on companies in this article

Related Content

  • Hungary contract for STRABAG
    May 4, 2020
    Austrian contractor STRABAG has been awarded a key road contract for Hungary.
  • New Bolivian highway programme planned
    June 17, 2015
    Bolivia's state-owned road operator Administradora Boliviana de Carreteras (ABC) has an ambitious road building programme. This will see the construction of a further 3,172km of roads, of which almost 1,000km will be completed in 2015. The 1,000km of roads on track for completion comprise some 16 projects in seven departments. ABC has budgeted US$1.17 billion for its programme of works, an increase over the $995.4 million for the previous financial year.
  • Progress for Stonehenge Tunnel bypass project
    April 6, 2020
    Progress is being seen with the planned Stonehenge Tunnel bypass project.
  • Regensburg road revamp will widen key stretch
    February 16, 2018
    Work is now commencing on widening a stretch of the A3 Autobahn where it passes through the Bavarian city of Regensburg. The 15km section of the A3 will be widened from its present two lanes to three lanes. The project is costing €270 million and will be carried out on the section from the junction between the A3 and B8 at Rosenhof to the east of Regensburg and running 15km westwards, past the junction with the A93 Autobahn route that connects with the A9 and Munich to the south. This work is needed as the