Skip to main content

Wekiva Parkway route opening in Florida

The first stretch of the Wekiva Parkway (State Road 429) is having its official opening in the US state of Florida on July 27th 2017. The 8km section of the Wekiva Parkway is being opened by the Central Florida Expressway Authority (CFX). The sections being opened are 1A and 1B, which have cost US$102.6 million to construct. These stretches of the route extend from where the SR 429 currently ends at the Connector Road near US 441, to a new interchange at Kelly Park Road. Work to build the project commenced
July 17, 2017 Read time: 2 mins

The first stretch of the Wekiva Parkway (State Road 429) is having its official opening in the US state of Florida on July 27th 2017. The 8km section of the Wekiva Parkway is being opened by the Central Florida Expressway Authority (CFX). The sections being opened are 1A and 1B, which have cost US$102.6 million to construct. These stretches of the route extend from where the SR 429 currently ends at the Connector Road near US 441, to a new interchange at Kelly Park Road. Work to build the project commenced in the summer of 2015.

The 8km section includes interchanges near US 441 at Connector Road and Kelly Park Road, along with bridges at Southfork Drive, Yothers Road, Ponkan Road and other locations. The Wekiva Parkway is the first expressway in Central Florida to feature all electronic tolling.  

CFX is building five parkway sections totalling 16km and more than $271 million in construction costs. The entire $1.6 billion Wekiva Parkway will complete Central Florida’s beltway, while helping to protect the natural resources surrounding the Wekiva River.

Related Content

  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b
  • Transpordiamet opens Tartu procurement
    May 20, 2021
    The Estonian Transport Administration - Transpordiamet - is tendering for the Tallinn–Tartu–Võru–Luhamaa highway section of the planned Western Tartu Bypass.
  • Romania’s DEx12 Craiova-Pitesti on target
    November 17, 2021
    The DEx12, costing nearly €1 billion, will include 10 junctions and 75 bridges and passages.
  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.