Skip to main content

Wekiva Parkway route opening in Florida

The first stretch of the Wekiva Parkway (State Road 429) is having its official opening in the US state of Florida on July 27th 2017. The 8km section of the Wekiva Parkway is being opened by the Central Florida Expressway Authority (CFX). The sections being opened are 1A and 1B, which have cost US$102.6 million to construct. These stretches of the route extend from where the SR 429 currently ends at the Connector Road near US 441, to a new interchange at Kelly Park Road. Work to build the project commenced
July 17, 2017 Read time: 2 mins

The first stretch of the Wekiva Parkway (State Road 429) is having its official opening in the US state of Florida on July 27th 2017. The 8km section of the Wekiva Parkway is being opened by the Central Florida Expressway Authority (CFX). The sections being opened are 1A and 1B, which have cost US$102.6 million to construct. These stretches of the route extend from where the SR 429 currently ends at the Connector Road near US 441, to a new interchange at Kelly Park Road. Work to build the project commenced in the summer of 2015.

The 8km section includes interchanges near US 441 at Connector Road and Kelly Park Road, along with bridges at Southfork Drive, Yothers Road, Ponkan Road and other locations. The Wekiva Parkway is the first expressway in Central Florida to feature all electronic tolling.  

CFX is building five parkway sections totalling 16km and more than $271 million in construction costs. The entire $1.6 billion Wekiva Parkway will complete Central Florida’s beltway, while helping to protect the natural resources surrounding the Wekiva River.

Related Content

  • Flyover and tunnel planned for D3 route in Slovakia
    February 13, 2015
    In Slovakia plans are in hand for work to the D3 route that will involve the construction of a flyover, a bridge and a tunnel. The flyover lies on the stretch of D3 between Zilina/Strazov and Zilina/Brodno. Work on this 4.25km section of the D3 is costing close to €255 million. The construction work commenced in June 2014 and is due for completion by 2017. The work is complex and includes building flyover over the Hricovska Prehrada Dam, as well as driving a tunnel and constructing bridge over the Kysuca Ri
  • One of Brazil’s main road routes will be upgraded
    November 16, 2012
    Brazil’s Ministry of Transportation is giving the go-ahead for a project that will see the upgrade of a 100km stretch of the BR-381 route. Located in Minas Gerais, the BR-381 will be widened and improved with the addition of extra lanes, making it a dual carriageway. The Ministry of Transportation has opened the first phase of the project to bids and bids have to be submitted before December 17th 2012.
  • Concrete paving a smoother surface using machine control technology
    May 17, 2017
    Innovative technology has been used to deliver a smooth concrete road surface on a busy stretch of highway in Nebraska. Much-needed work on a busy section of Interstate 80 has been carried out in Nebraska to improve the road surface. This is one of the most important highways in the US, providing a link that stretches right across the country between the east and west coasts. This busy highway carries a high percentage of heavy truck traffic as it is a vital transport route. However this constant flow of la
  • Tackling the UK's traffic congestion
    February 28, 2012
    The biggest problem on UK roads is congestion, and there is no shortage of ideas as to how it should be tackled. Patrick Smith reports. Congestion (and how to relieve it), along with safety, are among the top priorities facing those responsible for looking after the UK's roads. Road pricing, car-share lanes, greener vehicle initiatives and alternative methods of transport such as buses, trams and rail are all part of the approach, but prior to the current economic climate the nation's love affair with the c