Skip to main content

Washington DC to get new US$900mn bridge

A new bridge project to replace Washington DC’s Frederick Douglass Memorial Bridge and two traffic ovals at each end of the new span have been submitted by the Anacostia Waterfront Initiative and the District's Department of Transportation. Washington DC-based radio station WAMU has reported that the new US$900 million bridge project will transform the DC neighbourhoods lining the Anacostia River. The current four-lane Frederick Douglass Memorial Bridge, built in 1950 and named after slavery abolitionist Fr
August 5, 2013 Read time: 1 min
A new bridge project to replace Washington DC’s Frederick Douglass Memorial Bridge and two traffic ovals at each end of the new span have been submitted by the Anacostia Waterfront Initiative and the District's Department of Transportation.

Washington DC-based radio station WAMU has reported that the new US$900 million bridge project will transform the DC neighbourhoods lining the Anacostia River.

The current four-lane Frederick Douglass Memorial Bridge, built in 1950 and named after slavery abolitionist Frederick Douglass, will be replaced with a six-lane bridge. The new bridge will be brought into a more north-south alignment from its current northwest-southeast alignment.

Related Content

  • Auckland’s future strategic transport requirements
    July 5, 2012
    The Auckland Harbour Bridge is at the stage that it cannot cope with much more traffic, yet the population of the Auckland region continues to grow at a steady rate. Coupled with that, the bridge is a key link in the most important transport corridor in the country, State Highway One. Without it, the country would struggle to function. Not only home to New Zealand's largest city and one third of its population, Auckland's port is one of the country's largest. Some 140m north of the city is Marsden Point, th
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • Peru’s Matarani – Punta de Bonbon Highway
    January 5, 2016
    A major new highway project in Peru will improve connectivity for the Arequipa region - Mauro Nogarin writes Peru’s Matarani-Bonbon road project is an important route and forms part of the Camana - Dv Quilca - Ilo - Tacna highway project. The road stretches through several provinces in the Arequipa region. The deadline for completing the work is 720 days after January 2015, and it is scheduled to be completed by December 2016. Progress has been good and as of July 2015, it was 80% completed. The main
  • Pattullo Bridge deck near completion
    July 29, 2025
    For several weeks, crews have been installing concrete deck panels, steel girders and stay cables outward from the towers of the bridge that spans the Fraser River near Vancouver, Canada.