Skip to main content

Wacker Neuson rebar tiers at Queensferry

When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor. Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK. Construction
February 7, 2017 Read time: 2 mins
When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor.

Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK.

Construction work will take place 207m above sea level. Around 150,000tonnes of concrete will be poured and more than 37,000km of cabling will be used.

Also used will be four DF16 rebar tiers and 377,000 ties from 1651 Wacker Neuson. The DF16s tie “shear links” on rebar on the deck section of the bridge. Steel required for the final deck weighs 35,000tonnes - the equivalent weight of nearly 200 Boeing 747s.

“Thanks to the upright position of the DF16, work is now much more back-friendly,” explained John Rodgers, FCBC works manager. The mechanical device uses a proven twin-wire mechanism which ties up to 1,000 uniform and firm knots per hour.

Steelworkers are making 33,000 ties per section with the mechanical tier. The operator is independent of a battery and the necessary charging time. In addition, no scrap wire is produced which must be removed at the end of the work.

To compact the fresh concrete John and his team use 40 high-frequency internal vibrators of the IFRU series. “We use two different variants of the vibrator head size, 57mm and 38mm,” said Rodgers. They can be simply connected to the 1-phase power supply and are ready for operation.

Models in the IRFU series have an integrated frequency converter. No additional frequency converters are needed to operate this internal vibrator. Simply connect to a plug receptacle. Also in conjunction with a generator and with fluctuating input voltages IRFU is safe and reliable. Thanks to the complete potted electronic components, there is no danger of an electric shock.

For more information on companies in this article

Related Content

  • Building Spain's highest viaduct
    July 9, 2012
    Amid a mountain wilderness, a new highway system rises, featuring Spain's highest viaduct For years, motorists and truck drivers in northern Spain have had to endure using a dangerous road liable to traffic hold-ups, delays and accidents, and frequently impassable in the depths of winter. In any event it is a slow and tortuous climb from Molledo on the Cantabrian lowlands up the N-611 road through the Cantabrian Mountains to Palencia, on the Meseta, Spain's high central plateau.
  • Haver & Boecker’s mixed screen media options boosts efficiency
    November 7, 2018
    Haver & Boecker recently showcased at the AGG1 2018 exhibition in Houston, US, its blended screen media options for each vibrating screen deck. The Canadian aggregates equipment manufacturer says that the blended screen media approach offers improved efficiency by extending screen media life and minimising issues such as blinding and pegging. The company’s technicians work with producers, evaluating their applications, challenges and goals to customise screen media selection. Before making recommendations
  • Engine improvements for decarbonisation
    June 5, 2024
    As the need for decarbonisation becomes more pressing, engine firms are looking ahead to the next step for power systems, writes Mike Woof.
  • Top to bottom
    February 20, 2012
    Two long distance cyclists, one male and one female, have shown courage in the face of adversity, as well as sheer stubbornness, by riding bicycles from one side of the planet to the other. A New Zealand woman took 20 months to ride her cheap, 18 speed mountain bike from the UK to New Zealand. The journey took her through no less than 22 countries, including some of the world's most dangerous areas. The woman surprised members of the New Zealand Army stationed in Afghanistan when she turned up at their base