Skip to main content

Wacker Neuson rebar tiers at Queensferry

When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor. Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK. Construction
February 7, 2017 Read time: 2 mins
When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor.

Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK.

Construction work will take place 207m above sea level. Around 150,000tonnes of concrete will be poured and more than 37,000km of cabling will be used.

Also used will be four DF16 rebar tiers and 377,000 ties from 1651 Wacker Neuson. The DF16s tie “shear links” on rebar on the deck section of the bridge. Steel required for the final deck weighs 35,000tonnes - the equivalent weight of nearly 200 Boeing 747s.

“Thanks to the upright position of the DF16, work is now much more back-friendly,” explained John Rodgers, FCBC works manager. The mechanical device uses a proven twin-wire mechanism which ties up to 1,000 uniform and firm knots per hour.

Steelworkers are making 33,000 ties per section with the mechanical tier. The operator is independent of a battery and the necessary charging time. In addition, no scrap wire is produced which must be removed at the end of the work.

To compact the fresh concrete John and his team use 40 high-frequency internal vibrators of the IFRU series. “We use two different variants of the vibrator head size, 57mm and 38mm,” said Rodgers. They can be simply connected to the 1-phase power supply and are ready for operation.

Models in the IRFU series have an integrated frequency converter. No additional frequency converters are needed to operate this internal vibrator. Simply connect to a plug receptacle. Also in conjunction with a generator and with fluctuating input voltages IRFU is safe and reliable. Thanks to the complete potted electronic components, there is no danger of an electric shock.

For more information on companies in this article

Related Content

  • Wider range
    July 2, 2012
    Wacker Neuson is growing its G-series generator range, which now includes units with power outputs from 22-78kWA and with the G32 being the latest addition to the line-up. Wacker Neuson is well known for its hand-operated compactor units but is offering a novel model in the shape of its BS20, which is powered by a two stroke engine. This low-cost unit meets emission regulations nevertheless, due to a sophisticated design for the 80cc capacity engine.
  • Compaction innovations from key firms
    June 12, 2018
    The major manufacturers are introducing an array of advanced asphalt compaction machines - Mike Woof writes. New compaction machines are coming to market from an array of manufacturers, aiming to increase output and efficiency for road contractors. One of the most notable developments is with Hamm’s launch of a production hybrid compactor model, while other firms say they are also working on similar systems. However, several manufacturers have introduced new and improved machines with superior performance t
  • Skanska to start Black Cat upgrade
    November 30, 2023
    The A428 upgrade work in England was awarded in 2021 to create a 16km dual carriageway to improve journeys between Milton Keynes, Bedford and Cambridge, near London.
  • New equipment for materials testing
    January 13, 2014
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia. Guy Woodford reports