Skip to main content

Wacker Neuson rebar tiers at Queensferry

When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor. Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK. Construction
February 7, 2017 Read time: 2 mins
When the Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. This 2.7km structure is lying alongside the existing road bridge and the historic rail bridge and is the centrepiece of the upgrade to Scotland’s key cross-Forth transport corridor.

Responsible for the construction is Forth Crossing Bridge Constructors – FCBC, a consortium of companies from Germany, Spain, the US and the UK.

Construction work will take place 207m above sea level. Around 150,000tonnes of concrete will be poured and more than 37,000km of cabling will be used.

Also used will be four DF16 rebar tiers and 377,000 ties from 1651 Wacker Neuson. The DF16s tie “shear links” on rebar on the deck section of the bridge. Steel required for the final deck weighs 35,000tonnes - the equivalent weight of nearly 200 Boeing 747s.

“Thanks to the upright position of the DF16, work is now much more back-friendly,” explained John Rodgers, FCBC works manager. The mechanical device uses a proven twin-wire mechanism which ties up to 1,000 uniform and firm knots per hour.

Steelworkers are making 33,000 ties per section with the mechanical tier. The operator is independent of a battery and the necessary charging time. In addition, no scrap wire is produced which must be removed at the end of the work.

To compact the fresh concrete John and his team use 40 high-frequency internal vibrators of the IFRU series. “We use two different variants of the vibrator head size, 57mm and 38mm,” said Rodgers. They can be simply connected to the 1-phase power supply and are ready for operation.

Models in the IRFU series have an integrated frequency converter. No additional frequency converters are needed to operate this internal vibrator. Simply connect to a plug receptacle. Also in conjunction with a generator and with fluctuating input voltages IRFU is safe and reliable. Thanks to the complete potted electronic components, there is no danger of an electric shock.

For more information on companies in this article

Related Content

  • Bosch Rexworth upgrades eLION electrification platform for improved compatibility
    March 20, 2023
    Bosch Rexroth’s eLION electrification platform is fully compatible with North American charging infrastructure, the company announced. The compatibility is the result of a newly developed, single-phase onboard charger.
  • Wacker Neuson’s record-breaking quarter revenue
    May 10, 2012
    Wacker Neuson Group (WN) achieved its higher ever revenue quarter in the first three months of 2012. The €274million revenue recorded in Q1 2012 was a 29.3% rise on the €211.8million posted over the same period of 2011. “The compact equipment segment and the Americas region were our two strongest growth drivers, reporting revenue gains of 51% and 34% respectively relative to the previous year’s quarter,” said Cem Peksaglam, chief executive of WN. “Our expansion strategies are gaining traction. Despite gene
  • Benninghoven burners EVO JET
    March 1, 2025
    Benninghoven is a world market leader in burners for asphalt mixing plants and a manufacturer of multi-fuel burners with up to 4 fuels. The complete know-how and wealth of experience from over 70 years of burner competence support the development of unique burners with excellent properties.
  • Key projects free up Auckland's congested motorway network
    June 14, 2012
    A number of key projects in Auckland, New Zealand will free-up the city’s congested motorway network - Mary Searle reports.Auckland is a sprawling city, home to 1.4 million people, one third of New Zealand’s total population. Until recently, greater Auckland comprised Auckland city, North Shore city over the harbour bridge to the north, Waitakere city to the west and Manukau city to the south. An amalgamation of these various cities’ councils, plus the regional council and three district councils into one,