Skip to main content

Vietnam’s north-south highway being planned

Plans are being formalised for Vietnam’s massive North-South Expressway project. The tolled route will stretch 1,372km and the project will be split into 20 separate sections, with the work being carried out in two separate phases.
June 5, 2017 Read time: 1 min
RSS

Plans are being formalised for Vietnam’s massive North-South Expressway project. The tolled route will stretch 1,372km and the project will be split into 20 separate sections, with the work being carried out in two separate phases.

The first phase will be 713km long and will be carried out from 2017-2025, while it will cost an estimated US$5.74 billion. The project will be carried out under the build-operate-transfer model, with funding split between the Vietnamese Government and private investors.

Related Content

  • Vietnam’s North-South Highway expansion reaches southern apex
    November 22, 2023
    Vietnam’s North-South Expressway is to reach the country’s southern tip.
  • International interest strong for Vietnam expressway project
    July 2, 2019
    International interest is said to be strong in the tenders for sections of Vietnam’s massive North-South Expressway project. Japanese and Chinese firms have submitted bids for the eight sections of the route now open for tender. In all the expressway will measure some 2,100km in length. The first phase of the project is for 654km of the route with this work being handled in eight separate sections. These contracts will all be handled under the PPP model. The Vietnamese Government will manage a further three
  • Building programmes for Ho Chi Minh City in Vietnam
    June 9, 2014
    Ho Chi Minh City in Vietnam looks set to benefit from 14 infrastructure projects costing a total of US$9.44 billion. One of the key projects will be to improve and repair Luong Dinh Cua Street while another is for the building of the new Ha Noi Expressway-Eastern Ring Road link road. Loan facilities are being provided by the Sai Gon-Ha Noi Commercial Bank (SHB) to Phu My Construction (PMC). The construction programme also includes the Rach Chiec Bridge, five elevated highways and the Southern Ring Road. The
  • Vietnam’s North-South highway section given go-ahead
    September 21, 2018
    The Vietnamese Government has given the go-ahead for work on a key section of the country’s North-South highway project. This 7.5km stretch of the route will run between District 2's National Highway 22 and Hiep Phuoc Industrial Park. The work will cost US$365.4 million to carry out as it includes building the Phuoc Kieng, No 1, Rach Dia and Ba Chiem bridges. Located just to the south of Ho Chi Minh City, the Hiep Phuoc Industrial Park is in a delta area, which will require the construction of the bridge se