Skip to main content

Vietnam’s highway network is expanding

Vietnam is expanding its road and highway network with a series of major projects, as well as numerous upgrades to rural roads. A funding deal worth US$1.6 billion is being provided by the Asian Development Bank (ADB) for the Ben Luc yo Long Thanh National Highway. This route connects Dong Nai, Ho Chi Minh City and Long An. A portion of the necessary funding for ground clearance for the route is being provided by Vietnam’s State Budget. However the country is stopping work on the National Highway 3 project
August 1, 2018 Read time: 1 min

Vietnam is expanding its road and highway network with a series of major projects, as well as numerous upgrades to rural roads.

A funding deal worth US$1.6 billion is being provided by the 943 Asian Development Bank (ADB) for the Ben Luc yo Long Thanh National Highway. This route connects Dong Nai, Ho Chi Minh City and Long An. A portion of the necessary funding for ground clearance for the route is being provided by Vietnam’s State Budget.

However the country is stopping work on the National Highway 3 project connecting Hanoi with Thai Nguyen and the Cho Moi to Bac Kan National Highway. Problems with toll collection have caused the cancellation of the National Highway 3 project. Meanwhile problems with repayments to loans have caused the Choi Moi to Bac Kan project to be cancelled.

For more information on companies in this article

Related Content

  • US$410mn ADB loan to build second Vietnam Southern Highway
    August 14, 2013
    The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
  • Vietnam’s new beltway project
    October 12, 2018
    Work is progressing in Vietnam’s Ho Chi Minh City for construction of the new Beltway No3. An additional US$128.6 million is being set aside from the city’s budget to speed up work on the highway. The new beltway will measure 90km long, will allow vehicle speeds of up to 100km/h, with from two to four lanes in either direction. The route is being built in four sections. One stretch connects the Trung Luong expressway and National Highway No 22, another links National Highway No 22 and Binh Chuan, one joins
  • Last link in Vietnam’s North-South Expressway
    May 3, 2024
    The Chi Lang-Huu Nghi section is the last part of the 2,060km-long expressway that connects the southern Mekong Delta with the northern province of Lang Son, bordering China.
  • Vietnam’s expressway expansion programme
    February 23, 2022
    Vietnam’s expressway expansion programme is well underway.