Skip to main content

Vietnam tunnel project faces delays

The expansion work for the Hai Van 2 Tunnel project in Vietnam now looks to face delays. A dispute over land compensation by residents in the area is holding back progress. Around 38% of the work for the Hai Van Tunnel 2 project was supposed to have been finished by July 2018 but in fact, only 25% of the work has been carried out.
July 20, 2018 Read time: 1 min

The expansion work for the Hai Van 2 Tunnel project in Vietnam now looks to face delays. A dispute over land compensation by residents in the area is holding back progress. Around 38% of the work for the Hai Van Tunnel 2 project was supposed to have been finished by July 2018 but in fact, only 25% of the work has been carried out.

The upgrade work is required to increase capacity on Vietnam National Highway No1 as traffic volumes on the route are increasing. The 6.3km Hai Van Tunnel 2 will have twice the capacity and feature two lanes when the work is complete. The project also includes building new emergency rescue tunnels to connect Hain Van Tunnel 2 and Hai Van Tunnel 1. New approach roads are also being built to Hai Van Tunnel 2 as part of the project. The Hai Van Tunnel 2 was built in 2005, initially as an emergency access tunnel for Hai Van Tunnel 1.

Related Content

  • Expectations for growth of UAE infrastucture
    February 9, 2012
    The INTERMAT Middle East event is being launched at a pivotal time of major infrastructure development in the region. As with most sectors, the highways industry has not had a fantastic 18 months in the Gulf. Not only has the recession impacted the delivery of projects across the board, GCC Governments' attention have been switching increasingly to rail, as plans to roll out a Gulf-wide rail system gather steam. GCC countries will invest over US$119.6 billion in infrastructure projects over the next decade
  • Tunnel construction in Italy using breakers
    August 10, 2018
    Hydraulic breakers from Indeco have helped with the excavation of a road tunnel in Italy. The HP 7000 and HP 5000 units from Indeco were used for excavation of a stretch of tunnel where blasting could not be used due to the proximity of live traffic. The Greppoli Tunnel is located between Grosseto and Siena in the section of road near Civitella Paganico on the SGC E 78. The route connects the Tyrrhenia coast with the Adriatic and is a major highway, connecting Grosseto to Fano. The 100m-long Greppoli Tunne
  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.
  • A new tunnel for Vietnam
    March 22, 2023
    A new road tunnel link is planned for Vietnam.