Skip to main content

Vietnam plans highway building

Vietnam Expressway Corporation (VEC) reports strong interest in for the 58km Ben Luc-Long Thanh expressway project.
February 24, 2012 Read time: 1 min
2829 Vietnam Expressway Corporation (VEC) reports strong interest in for the 58km Ben Luc-Long Thanh expressway project. The road will cost US$1.6 billion to construct. The work on the expressway will be funded by 943 Asian Development Bank (ADB) and 2416 Japan International Cooperation Agency (JICA). JICA will fund construction of two bridges crossing the Soai Rap River and Long Tau River, with the work worth $635 million. Meanwhile ADB will fund roads and viaducts construction worth some $636 million. Also in Vietnam, the 56km Cau Gie-Ninh Binh highway project requires a further $168.2 million for work to be completed. 2560 Vietnam's Ministry of Transport says that the project is 84% complete. The cost of the work has increased due to factors such as climbing materials prices.

For more information on companies in this article

Related Content

  • International funding for Vietnam project
    February 13, 2012
    Funding for a 3km cable-stayed bridge in Vietnam's Mekong Delta region will be boosted with financial backing from the Export-Import Bank of Korea (Korea Eximbank).
  • Japanese input for Sudanese bridge project
    April 25, 2012
    A key agreement between the Sudanese Government and the Japan International Cooperation Agency (JICA) will see a new bridge being built in South Sudan. The US$90 million bridge will measure 560m long and will span the River Nile. A seven month feasibility study has already been carried out into the project for Sudan’s road and bridges ministry and construction is expected to take three years to complete. JICA has agreed to give technical assistance although it is not clear at this stage whether funding will
  • New bridge spanning Red River for Vietnam
    October 28, 2014
    A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.
  • Vietnam’s US$5.5 billion ring road project
    September 16, 2024
    Vietnam is planning US$5.5 billion ring road project for HCMC.