Skip to main content

Vietnam highway developments continue

Vietnam is continuing its programme of highway developments.
By MJ Woof November 6, 2023 Read time: 1 min
Further road and bridge works are being carried out and planned in Vietnam – image courtesy of © Hans Slegers|Dreamstime.com


Vietnam plans to build eight new expressways in the Central Highlands by 2030. This programme of construction will add around 830km to Vietnam’s expressway network. Construction is expected to cost nearly US$6.5 billion.

Work on the Tan Phu-Bao Loc expressway is due to commence in 2023. Other expressways planned will include routes from; Quy Nhon to Pleiku, Khanh Hoa to Buon Ma Thuot, Bao Loc to Lien Khuong, Gia Nghia to Chon Thanh and Bao Loc to Lien Khuong.

Meanwhile, plans are underway for the Ho Chi Minh City (HCMC) Beltway No4 project. The expressway will run through cost an estimated $776.75 million and should be completed by 2026.

Related Content

  • Vietnam’s new beltway project
    October 12, 2018
    Work is progressing in Vietnam’s Ho Chi Minh City for construction of the new Beltway No3. An additional US$128.6 million is being set aside from the city’s budget to speed up work on the highway. The new beltway will measure 90km long, will allow vehicle speeds of up to 100km/h, with from two to four lanes in either direction. The route is being built in four sections. One stretch connects the Trung Luong expressway and National Highway No 22, another links National Highway No 22 and Binh Chuan, one joins
  • $1.53 billion Vietnam expressway upgrade
    July 24, 2025
    A $1.53 billion Vietnam expressway upgrade project is planned.
  • Vietnam: work on Phuoc Khanh cable stayed bridge to begin in August
    June 22, 2015
    Work on Vietnam’s 3.1km Phuoc Khanh cable stayed bridge will start in August after a deal was signed with the government in June. The contract was signed by the Vietnam Expressway Corporation and a consortium made up of Japanese contractor Sumitomo Mitsui and local partner Civil Engineering Construction Corporation (Cienco 4). The bridge is part of the 57km Ben Luc-Long Thanh Expressway project running through Long An Province, Ho Chi Minh City and Dong Nai province in southern Vietnam. The highway will a
  • Elevated highway in Vietnam starting construction
    December 12, 2016
    Construction work on a new elevated highway route through Vietnamese conurbation Ho Chi Minh City is commencing. The project involves building a 30.4km stretch of highway, Elevated Road No5, through the busy metropolis and is expected to cost US$785.25 million. The new four lane road will run above National Highway 1A, with the work forming part of a wider project intended to help reduce Ho Chi Minh City’s chronic congestion problems. In all the city’s road transport department plans to construct five of th