Skip to main content

Vietnam expressway deals

Key Vietnam expressway deals are now underway.
By MJ Woof June 30, 2020 Read time: 2 mins
Vietnam has two major expressway projects being planned – image courtesy © Fckncg, Dreamstime.com

Important expressway links are being planned in Vietnam at present. One of these projects is for the construction of the Can Tho-Can Mau Expressway. This 130km route will connect Can Tho City with Ca Mau City, as the name suggests. The work on the link will be carried out between 2025 and 2030 and it will feature two lanes in either direction with a speed limit of 100km/h.

The expressway will run between Vinh Long Province's My Thuan-Can Tho Expressway, over the Can Tho 2 Bridge and end at the Ca Mau City bypass. For some of its distance the expressway will run alongside the existing National Highway 1. Building the expressway will cost in excess of US$2 billion, with the Vietnamese Government funding a portion of its construction while the rest of the financing required will likely come from private sources.

Meanwhile, plans are in hand for the 23km My Thuan-Can Tho Expressway project. This will run through Dong Thap Province and Vinh Long province in the Mekong Delta. The expressway will connect the My Thuan 2 Bridge with the National Highway 1A's Cha Va Intersection. The project is costing close to $206 million. Construction will start during 2020 and work on the first phase should take until 2023 to complete. The first phase of the project will see the expressway featuring two lanes in either direction and a speed limit f 80km/h although when complete it will have three lanes in either direction and a speed limit of 100km/h.

Related Content

  • US$1.1 billion PPP highway for Vietnam
    June 28, 2024
    A US$1.1 billion PPP highway is planned for Vietnam.
  • US$410mn ADB loan to build second Vietnam Southern Highway
    August 14, 2013
    The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
  • El Sillar – Bolivia’s challenging road project
    February 6, 2020
    Construction of Bolivia’s El Sillar highway, the country’s most complicated road project – Mauro Nogarin reports
  • East End Crossing Project—Availability payment P3 in action
    July 14, 2017
    Indiana exercised its authority to use a P3 contract when it partnered with Kentucky for new bridges across the Ohio River. Barney Allison and John Smolen* explain the groundbreaking availability payment deal. Earlier this year, traffic began rolling over the new tolled Lewis and Clark Bridge spanning the Ohio River from northern Kentucky to southern Indiana. The cable-stayed bridge is part of the award-winning Ohio Bridges Project to untangle traffic within the greater metropolitan area of Louisville, Kent