Skip to main content

Vietnam expressway deal progressing

Plans for Vietnam’s North-South expressway are progressing, with work moving ahead for key portions of the route’s eastern spur. A feasibility study has been carried out for the 29km Nha Trang-Cam Lam stretch, which is planned as a PPP project and is expected to cost around US$225 million. Feasibility studies for a further five portions of the North-South expressway are being carried out and should be ready shortly, with three feasibility studies already having been accepted in May 2018. Construction work f
June 14, 2018 Read time: 1 min

Plans for Vietnam’s North-South expressway are progressing, with work moving ahead for key portions of the route’s eastern spur. A feasibility study has been carried out for the 29km Nha Trang-Cam Lam stretch, which is planned as a PPP project and is expected to cost around US$225 million. Feasibility studies for a further five portions of the North-South expressway are being carried out and should be ready shortly, with three feasibility studies already having been accepted in May 2018. Construction work for the expressway is expected to commence in 2020.

Related Content

  • Sydney infrastructure plan revealed
    September 29, 2016
    Work on infrastructure development for the Australian city of Sydney is progressing well, according to a new report into the transport programme. Construction activity for the 10 year plan is running ahead of the original timeline with 11km of new roads having already been built. In all the plan calls for the construction of 61km of new roads. Construction work on the key M12 link is due to commence in 2020. In all the transport development programme is expected to cost US$2.7 billion to carry out, with wor
  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Vietnam’s north-south highway being planned
    June 5, 2017
    Plans are being formalised for Vietnam’s massive North-South Expressway project. The tolled route will stretch 1,372km and the project will be split into 20 separate sections, with the work being carried out in two separate phases.
  • Malaysia highway deal planned
    January 13, 2021
    Construction work is planned for a key Malaysia highway connection.