Skip to main content

Vietnam expressway deal moving forward

A pre-feasibility study is being planned for Vietnam’s Hoa Binh-Moc Chau Expressway project. Construction of the expressway is expected to cost US$857.4 million, with the work being handled under the PPP model. The 85km is planned to feature two lanes in either direction. Construction of the expressway is expected to reduce journey times between Hanoi and Son La, close to the border with Laos, from six hours at present, to just 2.5 hours in the future.
January 16, 2019 Read time: 1 min

A pre-feasibility study is being planned for Vietnam’s Hoa Binh-Moc Chau Expressway project. Construction of the expressway is expected to cost US$857.4 million, with the work being handled under the PPP model. The 85km is planned to feature two lanes in either direction. Construction of the expressway is expected to reduce journey times between Hanoi and Son La, close to the border with Laos, from six hours at present, to just 2.5 hours in the future.

Related Content

  • New bridge planned for key Indonesia link
    July 22, 2013
    A feasibility study worth US$199 million will be carried out for the planned Sunda Straits Bridge in Indonesia. The bridge itself is expected to cost close to $20 billion to construct. It will be of major economic importance for Indonesia by providing a direct road link between the islands of Sumatra and Java. The link will connect Sumatra directly to Indonesia’s capital, Jakarta, and the bridge is expected to be 27km long in all. The Sunda Straits Bridge will actually be a series of links connecting the sm
  • Vietnam's key coastal highway
    February 7, 2012
    A major new highway project is starting shortly in Vietnam, which will improve the country's links with its neighbours. The US$440 million project is for a 220km highway in the Mekong Delta and will eventually form part of a 1,000km road connecting Vietnam with Cambodia and Thailand.
  • Vietnam sets highway plan of action
    May 28, 2012
    Additional funding is being sought for the third stage of a project that will upgrade the 3,010km Ho Chi Minh Highway in Vietnam. The third phase of the project has an estimated investment capital of some US$14.7 billion and foreign and local investors are being invited to invest in the road through different funding structures. The funding models will include the proven build-transfer-operate (BTO), build-transfer (BT) and build-operate-transfer (BOT) systems, with from 20%-30% of the funding to come from
  • New Bangladesh expressway section to be built
    January 27, 2022
    A new Bangladesh expressway section is to be built in capital Dhaka.